View Item 
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Faculty of Agricultural Technology
      • UT - Agricultural and Biosystem Engineering
      • View Item
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Faculty of Agricultural Technology
      • UT - Agricultural and Biosystem Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Analisis dan perbaikan sistem kerja berdasarkan metode studi gerak dan waktu pada proses produksi biskuit long stick

      Thumbnail
      View/Open
      Full text (1.085Mb)
      Cover (282.3Kb)
      Abstract (289.4Kb)
      BAB I (297.6Kb)
      BAB II (339.5Kb)
      BAB III (360.5Kb)
      BAB IV (799.1Kb)
      Kesimpulan (294.7Kb)
      Daftar Pustaka (293.6Kb)
      Lampiran (407.3Kb)
      Date
      2011
      Author
      Putri, Ratih Kartikasari Nugraha
      Herodian, Sam
      Metadata
      Show full item record
      Abstract
      Every company want to increase their productivity. To achieve high productivity required special attention to effectiveness and efficiency of work accomplished. For that reason there is a need for analysis working movement and labor time required for one cycle of proccess. Time required to perform a proccess at the beginning and the end of a shift is different, related to decrement of labor’s motivation and stamina due to fatigue. Fatigue can be caused by working conditions, work capacity of workers, and others. Standard time is a “factor looseness and the adjustment factor is summed with the cycle time”. Standard time for the proccess of preparation of raw flour is 112.68 seconds, while the standard time for the packaging process is 90.74 seconds. Productivity can be calculated by dividing the output of that day with the number of workers and duration to accomplish one proccess, was obtained from the calculation of productivity of each workers in the process of preparation of wheat flour is 400 kilogram/hour, while the packaging productivity of each workers is 3.76 cartons/hour.
      URI
      http://repository.ipb.ac.id/handle/123456789/51359
      Collections
      • UT - Agricultural and Biosystem Engineering [3592]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository