Please use this identifier to cite or link to this item:
http://repository.ipb.ac.id/handle/123456789/78270Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Bary, M. Atta | - |
| dc.contributor.author | Syuaib, M.Faiz | - |
| dc.contributor.author | Rachmat, Muchlis | - |
| dc.date.accessioned | 2016-02-12T01:15:52Z | - |
| dc.date.available | 2016-02-12T01:15:52Z | - |
| dc.date.issued | 2013-12 | - |
| dc.identifier.issn | 0216-3160 | - |
| dc.identifier.uri | http://repository.ipb.ac.id/handle/123456789/78270 | - |
| dc.language.iso | id | id |
| dc.publisher | Asosiasi Agroindustri Indonesia bekerja sama dengan Departemen Teknologi Industri Pertanian-IPB | id |
| dc.title | Analisis Beban Kerja pada Proses Produksi Crude Palm Oil (CPO) Di Pabrik Minyak Sawit dengan Kapasitas 50 Ton Tbs/Jam | id |
| dc.type | Other | id |
| Appears in Collections: | Mechanical & Biosystem Engineering | |
Files in This Item:
| File | Size | Format | |
|---|---|---|---|
| JTIP Vol 23 No 3.pdf | 198.24 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.