Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/75210
Title: Optimalisasi produksi karet olahan di PTPN VIII Kebun Jalupang Subang
Authors: Kusnadi, Nunung
Fardhaka, Muhamad Seta Bagja
Issue Date: 2014
Abstract: Jalupang garden which is one of the business units of PTPN VIII. By using a linear program LINDO, this study was conducted to analyze the combination of processed rubber production in Gardens Jalupang that companies analyze the allocation of the use of inputs / resources on Jalupang Gardens in order to achieve optimal conditions. In the period of one year (May 2011-April 2012), Gardens Jalupang able to obtain optimum reception at the value of Rp 76,364,690,000.00. Meanwhile, the actual receipt is Rp 81,906,284,918.00 with dry rubber processed products as RSS as 2.17928 million Kilograms Dry Rubber (77.1%) and as many as 646 441 Kilograms Concentrated Latex Rubber Dry (22.9%). Then the results of the analysis indicate that the Resource Status of the limiting resource is Taksasi Latek Concentrated (LP). and Labor is not a limiting resource and reduction of as much as 20% of raw materials will greatly affect the amount of processed rubber production in Jalupang Gardens
URI: http://repository.ipb.ac.id/handle/123456789/75210
Appears in Collections:UT - Agribusiness

Files in This Item:
File Description SizeFormat 
H14msb.pdf
  Restricted Access
full text1.33 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.