Please use this identifier to cite or link to this item:
http://repository.ipb.ac.id/handle/123456789/74463
Title: | Simulasi Debit Puncak dan Distribusi Aliran Sungai Ciliwung Hulu |
Authors: | Hidayat, Yayat Baskoro, D. P. Tejo Nasution, Prawira Adi Putra |
Issue Date: | 2015 |
Abstract: | Daily discharge data of Ciliwung Watershed have been measured based on water level on Water Level Stations of Katulampa. Discharge of Ciliwung Watershed is contributed by its sub-watershed discharge. Discharge data of each sub-watersheds are not recorded, therefore sub-watershed discharge needs to simulate. The aim of this study is to simulate contribution of each sub-watershed discharge of Upper Ciliwung Watershed. The peak discharge was estimated using HEC-WMS v.8.1 with Soil Conservation Service - Curve Number (SCS-CN) method. The result showed that the simulated peak discharges has a good correlation with observed peak discharges, with the value of R2 is 0,701. RMSE is 15,55 with the lowest peak discharge is 8,23 m3/s and highest is 102,26 m3/s. The Upper Ciliwung Watershed is divided into six sub-watersheds, which are Tugu (4897 ha), Ciesek (2564 ha), Cisarua (2293 ha), Cisukabirus (1729 ha), Cibogo (1285 ha), and Ciseuseupan (1207 ha). CN of sub-watersheds are 74,0 for Ciesek, 72,5 (Tugu), 71,0 (Cisukabirus), 70,7 (Cibogo), 69,3 (Cisarua), and 67,9 (Ciseuseupan). The result showed that Tugu sub-watershed contributed the highest discharge (39%), then followed by 29% (Ciesek), 11% (Cisukabirus), 9% (Cisarua), 7% (Cibogo), and 3% (Ciseuseupan). |
URI: | http://repository.ipb.ac.id/handle/123456789/74463 |
Appears in Collections: | UT - Soil Science and Land Resources |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
A15pap.pdf Restricted Access | full text | 1.38 MB | Adobe PDF | View/Open |
Abstrak.pdf Restricted Access | Abstract | 338.38 kB | Adobe PDF | View/Open |
Bab I Pendahuluan.pdf Restricted Access | Bab l Pendahuluan | 279.85 kB | Adobe PDF | View/Open |
TINJAUAN PUSTAKA.pdf Restricted Access | Bab II Tinjauan Pustaka | 531.31 kB | Adobe PDF | View/Open |
METODE.pdf Restricted Access | Bab lll Metode Penelitian | 528.28 kB | Adobe PDF | View/Open |
HASIL DAN PEMBAHASAN.pdf Restricted Access | Bab IV Hasil dan Pembahasan | 1.04 MB | Adobe PDF | View/Open |
SIMPULAN DAN SARAN.pdf Restricted Access | Bab V Simpulan dan Saran | 281.5 kB | Adobe PDF | View/Open |
DAFTAR PUSTAKA.pdf Restricted Access | Daftar Pustaka | 335.19 kB | Adobe PDF | View/Open |
LAMPIRAN.pdf Restricted Access | Lampiran | 446.81 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.