Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/72524
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorAman, Amril
dc.contributor.advisorHanum, Farida
dc.contributor.authorMuttaqin, Zaenal
dc.date.accessioned2014-12-24T02:07:50Z
dc.date.available2014-12-24T02:07:50Z
dc.date.issued2014
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/72524
dc.description.abstractOne of the main issues of water distribution process relates to effectiveness of pumps operation. When a pump was turn on there will be a power surge that makes it requires higher power, such that initial power is much greater than normal power. In this manuscript, optimal use of pump for the water distribution at TPB IPB dormitory is discussed. That problem was modeled into an integer linear programming and solved by using LINGO 11.0 software. The model is solved to obtain the pump operation scheduling which minimize energy consumption of electricity.en
dc.language.isoid
dc.subject.ddcBogor-Jawa Baraten
dc.subject.ddc2014en
dc.subject.ddcSoffwareen
dc.subject.ddcMathematicsen
dc.titleOptimasi Distribusi Air Bersih di Asrama TPB IPBen
dc.subject.keywordBogor Agricultural University (IPB)en
dc.subject.keywordwater distributionen
dc.subject.keywordpump schedulingen
dc.subject.keywordoptimizationen
Appears in Collections:UT - Mathematics

Files in This Item:
File Description SizeFormat 
G14zmu.pdf
  Restricted Access
full text1.5 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.