Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/62288
Title: Penerapan Pelatihan GL’s Role dan Toyota Production System pada Unit Assembly Shop, Karawang Plant, PT Toyota Motor Manufacturing Indonesia
Authors: Herodian, Sam
Rachmatia, Novianda
Keywords: Bogor Agricultural University (IPB)
Takt time,
motion and time study
Toyota production system
gl’s role
standardized work
Issue Date: 2010
Abstract: Gl’s role training is training that specially given for line head in order to know, understand, can do and continue improvement concern to their role as a line head. Ideal situations for a line head are if the line head understand own group’s standardized work and fundamental skill deeply, and manage their group smoothly through Abnormality Management based on Genchi-Genbutsu. Meanwhile, Toyota Production System training is training that purpose to produce vehicle with better quality, less expensive, more timely, to more customer. Less expensive because of company manage to reduce production cost by muda disappearance totally. Analysis to look for root cause why there are no line head that implement training that their got in their line is because line heads don’t understand methods to perform gl’s role on the job development. The other root cause is the line head’s superior are not involved on the job development implementation. Countermeasure for the root causes are program for explain OJD method and gl’s role training that will be given for superior, starting from section head up to department head. This training purpose on superior can know and understand tline head’s real role, and assign work based on their role. On motion and time study analysis did by 2,1 minutes takt time (126 seconds. But on the videos take, seen that to finish one process, the operator needs 174 minutes (over the takt time). That can cause delay on process, even can evokes line stop, and operator needs help from other member. After improvement, time to finish one cycle job decreased, but still over from takt time.
URI: http://repository.ipb.ac.id/handle/123456789/62288
Appears in Collections:UT - Agricultural and Biosystem Engineering

Files in This Item:
File Description SizeFormat 
F10nra.pdf
  Restricted Access
full text2.36 MBAdobe PDFView/Open
BAB I Pendahuluan.pdf
  Restricted Access
BAB I424.21 kBAdobe PDFView/Open
BAB II Keadaan Umum Lokasi Perusahaan.pdf
  Restricted Access
BAB II702.86 kBAdobe PDFView/Open
BAB III Tinjauan Pustaka.pdf
  Restricted Access
BAB III462.55 kBAdobe PDFView/Open
BAB IV Metodologi.pdf
  Restricted Access
BAB IV387.36 kBAdobe PDFView/Open
BAB IX Rekomendasi.pdf
  Restricted Access
BAB IX352.06 kBAdobe PDFView/Open
BAB V Gl's Role.pdf
  Restricted Access
BAB V748.4 kBAdobe PDFView/Open
BAB VI Toyota Production System.pdf
  Restricted Access
BAB VI489.16 kBAdobe PDFView/Open
BAB VII Pembahasan.pdf
  Restricted Access
BAB VII627.2 kBAdobe PDFView/Open
BAB VIII Kesimpulan dan Saran.pdf
  Restricted Access
BAB VIII380.04 kBAdobe PDFView/Open
Cover.pdf
  Restricted Access
Cover305 kBAdobe PDFView/Open
Daftar Pustaka.pdf
  Restricted Access
Daftar Pustaka375.31 kBAdobe PDFView/Open
Lampiran.pdf
  Restricted Access
Lampiran884.52 kBAdobe PDFView/Open
Ringkasan.pdf
  Restricted Access
Ringkasan332.59 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.