Please use this identifier to cite or link to this item:
http://repository.ipb.ac.id/handle/123456789/61869Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.advisor | Djatna, Eng. Taufik | |
| dc.contributor.author | Rohman, Agus Hidayatul | |
| dc.date.accessioned | 2013-04-01T06:41:20Z | |
| dc.date.available | 2013-04-01T06:41:20Z | |
| dc.date.issued | 2012 | |
| dc.identifier.uri | http://repository.ipb.ac.id/handle/123456789/61869 | |
| dc.description.abstract | Production scheduling is an important aspect to support the success of a manufacturing company in achieving the target of production planning and affects the implementation of the production process over a period of time. The amount of idle time in scheduling are considered less effective in the production line and detailed production scheduling becomes a problem to be solved with rearrangment of the daily activities in PT. MDS. Preliminary research results indicate that production scheduling in PT. MDS influenced by demand of products, stock products, a number of production, downtime of machine cause of change over time, the order of production scheduling, transportation delay between machines, and working time of machine. A Critical ratio method, the next grouping of products, and re-sequencing of production process with Shortest Processing Time method is the right method in response to a scheduling problem in PT. MDS. A Critical ratio method is useful to sort the product type, while the grouping of products and the Shortest Processing Time method useful to maximize the use of equipments as well as reducing of idle time. The results showed a decreased machine utilization of 64% to 60% and downtime of machine decreased to 5%. | en |
| dc.publisher | IPB ( Bogor Agricultural University ) | |
| dc.subject | utilization of machine | en |
| dc.subject | idle time | en |
| dc.subject | production sequence | en |
| dc.subject | critical ratio | en |
| dc.subject | shortest processing time | en |
| dc.subject | productivity | en |
| dc.title | Model Perbaikan Penjadwalan Produksi di PT. MDS,Cikarang - Bekasi | en |
| Appears in Collections: | UT - Agroindustrial Technology | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| F12ahr.pdf Restricted Access | fulltext | 1.51 MB | Adobe PDF | View/Open |
| Abstract.pdf Restricted Access | Abstract | 374.53 kB | Adobe PDF | View/Open |
| BAB I Pendahuluan.pdf Restricted Access | BAB I | 382.34 kB | Adobe PDF | View/Open |
| BAB II Kondisi Umum Perusahaan.pdf Restricted Access | BAB II | 391.25 kB | Adobe PDF | View/Open |
| BAB III Tinjauan Pustaka.pdf Restricted Access | BAB III | 380.21 kB | Adobe PDF | View/Open |
| BAB IV Metode Penelitian.pdf Restricted Access | BAB IV | 542.11 kB | Adobe PDF | View/Open |
| BAB V Pemodelan Penjadwalan.pdf Restricted Access | BAB V | 409.04 kB | Adobe PDF | View/Open |
| BAB VI Hasil dan Pembahasan.pdf Restricted Access | BAB VI | 506.12 kB | Adobe PDF | View/Open |
| BAB VII Kesimpulan dan Saran.pdf Restricted Access | BAB VII | 366 kB | Adobe PDF | View/Open |
| Cover.pdf Restricted Access | COVER | 373.6 kB | Adobe PDF | View/Open |
| Daftar Pustaka.pdf Restricted Access | DAFTAR PUSTAKA | 366.75 kB | Adobe PDF | View/Open |
| Lampiran.pdf Restricted Access | LAMPIRAN | 1.02 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.