Title: Analisis Kinerja Waktu Pada Proyek Pembangunan Gedung Perpustakaan Dengan Menggunakan Metode Jalur Kritis (Studi Kasus : Proyek X Oleh PT. ABC)
Authors: Widyarti, Meiske
Martendreck, Bayu Mulatama
Keywords: Bogor Agricultural University (IPB)
time performance
project management
project construction
Critical path method
Issue Date: 2012
Abstract: Construction in Indonesia is still continuing to meet a range of facilities required. In the implementation of a project, there are some aspects that should be concern, such as limited time, cost, and good in quality and safety. Limited availability of time on the project development is a challenge that must be resolved by implementing the development. A good and reliable project management is the main key of development project can be completed according to plan. Performances of a project, including time, cost, and also quality and safety performance. A construction project must be able to achieve a good performance. Therefore, it takes an instrument and method to analyze the performance of the project during the project underway, especially the time performance. This study will be focused in analyzing project management that is time performance at library construction Project X by PT. ABC. This study will be comparing library development project which use Barchart and S curve with Critical Path Method, by using Microsoft Project 2010 software to analyze time performance every week during construction. Analyze of this study shows that the library building has already been built corresponding plan and has appropriate with critical path method. There is some discrepancies identified comparing with plan schedule, it shows that some works has done behind schedule, but overall the construction can be finished on schedule. Realization of the cumulative weekly weight always exceeds cumulative weekly weight plan, with the smallest value at first week (+0.4888%) and the largest value at thirteenth week (+10.4538%). But, there are several weeks of work that realization of the cumulative weekly weight does not reach the plan, at sixth week (-2.3986%), seventh week (-1.3036%), and the tenth week (-1.7140%). At last the project management on time performance during the library construction Project X by PT. ABC shows a good performance.
URI: http://repository.ipb.ac.id/handle/123456789/57925
Appears in Collections:UT - Civil and Environmental Engineering

Files in This Item:
File Description SizeFormat 
ABSTRACT.pdf
  Restricted Access
Abstract391.66 kBAdobe PDFView/Open
BAB I. PENDAHULUAN.pdf
  Restricted Access
BAB I365.53 kBAdobe PDFView/Open
BAB II. TINJAUAN PUSTAKA.pdf
  Restricted Access
BAB II466.68 kBAdobe PDFView/Open
BAB III. METODOLOGI PENELITIAN.pdf
  Restricted Access
BAB III391.59 kBAdobe PDFView/Open
BAB IV. HASIL DAN PEMBAHASAN.pdf
  Restricted Access
BAB IV621.53 kBAdobe PDFView/Open
BAB V. KESIMPULAN DAN SARAN.pdf
  Restricted Access
BAB V395.19 kBAdobe PDFView/Open
COVER.pdf
  Restricted Access
Cover641 kBAdobe PDFView/Open
DAFTAR PUSTAKA.pdf
  Restricted Access
Daftar Pustaka389.04 kBAdobe PDFView/Open
F12bmm.pdf
  Restricted Access
full text3.02 MBAdobe PDFView/Open
LAMPIRAN.pdf
  Restricted Access
Lampiran2.2 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.