Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/52080
Title: Penjadwalan Transportasi Tandan Buah Segar dan Tandan Kosong Kelapa Sawit (Studi Kasus di PTPN VIII Kertajaya Banten)
Authors: Machfud
Randa, Dimas Gusti
Keywords: transportation
scheduling,
oil palm
Bogor Agricultural University (IPB)
Issue Date: 2011
Abstract: Transportation scheduling nowadays has been considered as one of important factor in efficiency of an industry production system. In a context of oil palm industry, transportation scheduling is in charge of implementation of fresh fruit bunch transportation from the field to the factory, and empty fruit bunch, as by product of fresh fruit bunch processing in factory, to the field. Research in PTPN VIII Kertajaya was done in order to meet optimization of transportation resource allocation. Transportation scheduling was implemented by considering crop scheduling and factory process scheduling. This transportation model scheduling consists of three sub models: production forecasting, crop route, and vehicle number. Data of daily production in January and February 2011 was simulated in a fit distribution and used as the basic of daily production forecasting in March 2011. Fresh fruit bunch production forecasting was used to decide the crop route, which was trip number needed to collect all fresh fruit bunches in all filed divisions. All trips needed and production time provided were input of vehicle number calculation, then these trips were scheduled in each time unit. Model validation used sMAPE and MAPE tests. Fresh fruit bunch forecasting resulted 159%, 95%, 67%, and 51% of sMAPE value for each Division 1, Division 2, Division 3, and Divison 4. It is better than current one used in the company which results 161%, 138%, 77%, and 65%. MAPE value for empty fruit bunch production forecasting is 23.41% and vehicle number forecasting is 12.43%.
URI: http://repository.ipb.ac.id/handle/123456789/52080
Appears in Collections:UT - Agroindustrial Technology

Files in This Item:
File Description SizeFormat 
F11dgr.pdf
  Restricted Access
Full text1.84 MBAdobe PDFView/Open
F11dgr_Cover.pdf
  Restricted Access
Cover381.71 kBAdobe PDFView/Open
F11dgr_Abstract.pdf
  Restricted Access
Abstract358.18 kBAdobe PDFView/Open
F11dgr_BAB I Pendahuluan.pdf
  Restricted Access
BAB I 356.11 kBAdobe PDFView/Open
F11dgr_BAB II Tinjauan Pustaka.pdf
  Restricted Access
BAB II 850.31 kBAdobe PDFView/Open
F11dgr_BAB III Metodologi.pdf
  Restricted Access
BAB III780.56 kBAdobe PDFView/Open
F11dgr_BAB IV Hasil dan Pembahasan.pdf
  Restricted Access
BAB IV868.69 kBAdobe PDFView/Open
F11dgr_Kesimpulan.pdf
  Restricted Access
Kesimpulan352.3 kBAdobe PDFView/Open
F11dgr_Daftar Pustaka.pdf
  Restricted Access
Daftar Pustaka398.86 kBAdobe PDFView/Open
F11dgr_Lampiran.pdf
  Restricted Access
Lampiran922.14 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.