Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/51206
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorSubrata, I Dewa Made Subrata
dc.contributor.advisorPurwanto, Yohanes Aris
dc.contributor.authorAl-Kindi, Hablinur
dc.date.accessioned2011-10-21T06:48:14Z
dc.date.available2011-10-21T06:48:14Z
dc.date.issued2011
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/51206
dc.description.abstractModel of Energy Independent Village based on micro hydro has been implemented in Kampung Lebakpicung, Hegarmanah, Cibeber, Lebak, Banten Province. This area located directly adjacent to the National Park area of Halimun Salak Mountain. Three main issues have been proposed in the development of energy independent village based on micro hydro namely providing the electricity for local community, developing economic productive using the idle electricity as well as coserving the forest area near village through reforestration. All of three issues have been running well since 2 years ago and this program was strongly supported by local community. Institution based on the local community initiative has also been developed to take responsibility on the sustainability of micro hydro project. This institution has responsibility to run the operational of the micro hydro and to develop the utilization of idle electricity during day time for productive economic activity for local community. The objectives of this study were: 1) to analyze cost of electricity produced by micro hydro. The cost analysis includes kW of electricity could be generated and the price per kW which was based on the operational cost and maintenance cost, 2). to determine the energy cost must be spent by households before and after micro hydro project. Maintenance and operational cost was analyzed in order to consider the cost must be paid by each household. The study was focused on the collection of data i.e. social economic, potency of electricity, technical data of micro hydro. It was found that the potency of micro hydro power plant was 25-74 kW. The cost of electricity from micro hydro power plant was Rp 1.015/kWh. This price was higher than that price of electricity supplied by National Electricity Company with subsidy scheme of 450 Watt, i.e Rp. 415/kWh. The price of electricity that paid by the community was Rp. 239/kWh. If it was assumed that initial cost for installation of micro hydro power plant was under scheme of grant through CSR (Corporate Social Responsibility) of Natioanal Electriocity Company (PT PLN), it was resulted the (nett present value) NPV was Rp. 16.578.189,- at year of 20, payback period at year between 15 to 16. Net B/C was 1,1 and Gross B/C was 1,07 with IRR at 11 percent. BEP of electricity produced by micro hydro power plant was 162.744 kW/year. Utilization of the idle electricity produced by micro hydro power plant at Kampung Lebakpicung during day time could be considered by installing the small scale coffee processing unit.en
dc.publisherBogor Agricultural University (IPB)
dc.subjectenergy independent villageen
dc.subjectmicro hydroen
dc.subjectcost of electricityen
dc.subjectcoffee processingen
dc.titleAnalisis tekno ekonomi mikrohidro untuk desa mandiri energy di Kampung Lebakcipung, Jawa Baraten
dc.title.alternativeTechno-economic analysis of micro hydro at energy self-sufficient village of Kampung Lebakpicung, Hegarmanah, Cibeber, Lebak, Banten Provinceen
Appears in Collections:UT - Agroindustrial Technology

Files in This Item:
File Description SizeFormat 
F11hak.pdf
  Restricted Access
Full Text13.94 MBAdobe PDFView/Open
F11hak_Cover.pdf
  Restricted Access
Cover441.22 kBAdobe PDFView/Open
F11hak_Abstract.pdf
  Restricted Access
Abstract286.58 kBAdobe PDFView/Open
F11hak_BAB I Pendahuluan.pdf
  Restricted Access
BAB I358.01 kBAdobe PDFView/Open
F11hak_BAB II Tinjauan Pustaka.pdf
  Restricted Access
BAB II704 kBAdobe PDFView/Open
F11hak_BAB III Metode Penelitian.pdf
  Restricted Access
BAB III319.59 kBAdobe PDFView/Open
F11hak_BAB IV Hasil dan Pembahasan.pdf
  Restricted Access
BAB IV12.97 MBAdobe PDFView/Open
F11hak_Kesimpulan.pdf
  Restricted Access
Kesimpulan279.29 kBAdobe PDFView/Open
F11hak_Daftar Pustaka.pdf
  Restricted Access
Daftar Pustaka279.01 kBAdobe PDFView/Open
F11hak_Lampiran.pdf
  Restricted Access
Lampiran409.8 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.