Please use this identifier to cite or link to this item:
http://repository.ipb.ac.id/handle/123456789/48229| Title: | Studi Gerak Dan Waktu Serta Analisis Keseimbangan Lini Produksi Pada Proses Pembuatan Meja Setrika Di PT. Cosma Cipta Sejahtera Bogor |
| Authors: | Mardiyanti, Fina |
| Keywords: | time, motion line, balancing iron, table. |
| Issue Date: | 2011 |
| Publisher: | IPB (Bogor Agricultural University) |
| Abstract: | Time and Motion Study according to Barnes (1976) is the systematic study of work systems with the purposes of developing the preferred system and method usually the one with the lowest cost, standardizing this system and method, determining the time required by a qualified and properly trained person working at a normal pace to a specific task or operation, and assisting in training the worker in the preferred method. This activity had done from November 2010 until Februari 2011 at PT. Cosma Cipta Sejahtera, Cangkurawok Village, Dramaga, Bogor. Based on calculation, writers get the standard time is 4775.53 seconds or 79.59 minute or 1.33 hours. From this results, production target that can achieved by operators is 187 units/day. This results only different 7 units/day from production target that given by company, is 180 units/day. the total line efficiency score before repairing is 13.98% and after repairing with Helgson-Birnie methods is 82.01%. Line efficiency get increase after repairing with Helgson-Birnie methods. It looked at smoothness index and balance delay, that have decrease significantly from 7245.80 until 626.48, and for balance delay from 21.05% until 4.39%. This results showed that the writer’s idea condition have a better line balancing than first condition. Besides that, repairing of work condition are more important for operator to make them work comfortably, so it can minimize the late of achievement production target that can make an extra time for operator. |
| URI: | http://repository.ipb.ac.id/handle/123456789/48229 |
| Appears in Collections: | UT - Agricultural and Biosystem Engineering |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| F11fma.pdf Restricted Access | Undergraduate Thsis | 179.41 MB | Adobe PDF | View/Open |
| FMA01_cover.pdf Restricted Access | Cover | 324.78 kB | Adobe PDF | View/Open |
| FMA02_abstract.pdf Restricted Access | Abstract | 272.13 kB | Adobe PDF | View/Open |
| FMA03_ringkasan.pdf Restricted Access | Ringkasan | 273.69 kB | Adobe PDF | View/Open |
| FMA04_judul.pdf Restricted Access | Judul | 266.14 kB | Adobe PDF | View/Open |
| FMA05_lembar pengesahan.pdf Restricted Access | Lembar Pengesahan | 266.24 kB | Adobe PDF | View/Open |
| FMA06_pernyataan sumber skripsi.pdf Restricted Access | Pernyataan Sumber Skripsi | 266.59 kB | Adobe PDF | View/Open |
| FMA07_copyright.pdf Restricted Access | Copyright | 265.93 kB | Adobe PDF | View/Open |
| FMA08_biodata.pdf Restricted Access | Biodata | 1.28 MB | Adobe PDF | View/Open |
| FMA09_kata pengantar.pdf Restricted Access | Kata Pengantar | 276.72 kB | Adobe PDF | View/Open |
| FMA10_daftar isi.pdf Restricted Access | Daftar Isi | 283.61 kB | Adobe PDF | View/Open |
| FMA11_BAB I_pendahuluan.pdf Restricted Access | BAB I | 273.81 kB | Adobe PDF | View/Open |
| FMA12_BAB II_tinjauan pustaka.pdf Restricted Access | BAB II | 1.61 MB | Adobe PDF | View/Open |
| FMA13_BAB III_Metode penelitian.pdf Restricted Access | BAB III | 296.27 kB | Adobe PDF | View/Open |
| FMA14_BABIV_hasil dan pembahasan.pdf Restricted Access | BAB IV | 35.03 MB | Adobe PDF | View/Open |
| FMA15_BAB V_simpulan dan saran.pdf Restricted Access | BAB V | 273.47 kB | Adobe PDF | View/Open |
| FMA16_daftar pustaka.pdf Restricted Access | Daftar Pustaka | 271.88 kB | Adobe PDF | View/Open |
| FMA17_lampiran.pdf Restricted Access | Lampiran | 145.57 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.