Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/29878
Title: Waktu kerja dan produktivitas penerbangan kayu penuh (Whole Tree) pada pengusahaan hutan alam
Other Titles: Jurnal Teknologi Hasil Hutan, Fakultas Kehutanan IPB Vol.XV No.2, Th. 2002
Authors: Budiaman, Ahmad
Issue Date: 2002
Publisher: IPB (Bogor Agricultural University)
Series/Report no.: Vol.XV No.2
Abstract: fen hectares of natural forest stand under forest concession in South Sumatra were harvested by selective cutting. A whole tree felling operation was done in the studi area. in which felling operation consist of tree felling and processing both commercial stem arid non-commercial stem. Average harvesting intensity was 6 trees per hectare. Harvested area had slope below 30 %. Average diameter of tree ranged from 50 cm to 109 cm. Feller crew with one cahinsaw's operator and one helper felled marked commercial tree using STIHL 70. Total felling time of whole tree system can be predicted by diameter of felled tree (DBH). Felling time and processing time (bucking) of comercial stem directly related to stem diameter. but there was not direct relation between preparation time and processing non comercial stem under natural forest and DBH Felling time of whole tree system increased 21.94 % compare to convensional felling.
URI: http://repository.ipb.ac.id/handle/123456789/29878
Appears in Collections:Jurnal Teknologi Hasil Hutan

Files in This Item:
File Description SizeFormat 
ahmad_budiaman_2002_No2_2-6.pdfe-Journal687.47 kBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.