Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/170857
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorSukria, Heri Ahmad-
dc.contributor.advisorBarkah, Nisa Nurmilati-
dc.contributor.authorFAUZININGSIH, ELITA-
dc.date.accessioned2025-08-28T13:14:35Z-
dc.date.available2025-08-28T13:14:35Z-
dc.date.issued2025-
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/170857-
dc.description.abstractPenelitian ini bertujuan untuk mengevaluasi kinerja proses serta memetakan Value Stream Mapping (VSM) produksi pakan pelet pada Edu-Feedmill. Evaluasi kinerja proses produksi dilakukan melalui perhitungan utilisasi dan efisiensi proses produksi pakan pelet pada Edu-Feedmill. Kemudian dilakukan analisis VSM sebagai tools pada lean manufacturing yang mengidentifikasi pemborosan berikut penyebab permasalahan melalui current dan future state map. Kapasitas produksi pakan pelet pada Edu-Feedmill secara keseluruhan masih rendah dilihat dari nilai efisiensi dan utilisasi yang masih rendah di bawah 80%. Total lead time sebelum perbaikan adalah 28025 detik sedangkan setelah perbaikan total lead time setelah 24458 detik. Analisis pemborosan menunjukkan besarnya persentase aktivitas tidak bernilai tambah 14,29%. Penelitian ini dapat disimpulkan bahwa upaya dari perbaikan proses produksi pakan pelet pada Edu-Feedmill dengan pendekatan VSM meningkatkan perbaikan Process Efficiency Cycle (PEC) sebesar 8,34%.-
dc.description.abstractThis study aims to evaluate process performance and map the Value Stream Mapping (VSM) of pellet feed production at Edu-Feedmill. Process performance evaluation is carried out by calculating the utilization and efficiency of the pellet feed production process at Edu-Feedmill. Then, VSM analysis is performed as a lean manufacturing tool that identifies waste and the causes of problems through current and future state maps. The overall pellet feed production capacity at Edu-Feedmill is still low, as indicated by the efficiency and utilization values, which are below 80%. The total lead time before improvement was 28,025 seconds, while the total lead time after improvement was 24,458 seconds. The waste analysis showed that the percentage of non-value-added activities was 14.29%. This study concludes that efforts to improve the pellet feed production process at Edu-Feedmill using the VSM approach increased the Process Efficiency Cycle (PEC) by 8.34%.-
dc.description.sponsorshipnull-
dc.language.isoid-
dc.publisherIPB Universityid
dc.titleEfisiensi dan Utilisasi Proses Produksi Pakan Pelet pada Edu-Feedmill dengan Pendekatan Value Stream Mappingid
dc.title.alternativeEfficiency and Utilization of Pellet Feed Production Processes at Edu-Feedmill Using a Value Stream Mapping Approach-
dc.typeSkripsi-
dc.subject.keywordLead Timeid
dc.subject.keywordLean Manufacturingid
dc.subject.keywordPemborosanid
dc.subject.keywordValue Stream Mappingid
Appears in Collections:UT - Nutrition Science and Feed Technology

Files in This Item:
File Description SizeFormat 
cover_D2401211128_f47a23fb374144aeb36d96c73ab8529b.pdfCover570.91 kBAdobe PDFView/Open
fulltext_D2401211128_70c9c10b47804f3a95680d4db96ce81b.pdf
  Restricted Access
Fulltext2.23 MBAdobe PDFView/Open
lampiran_D2401211128_cf82194efd214ad2a5ea0acfe6fc21e3.pdf
  Restricted Access
Lampiran8.75 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.