Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/170166
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorSantosa, Sesar Husen-
dc.contributor.authorHariyad, Romy Rommaretra Cahyaagama-
dc.date.accessioned2025-08-23T04:15:32Z-
dc.date.available2025-08-23T04:15:32Z-
dc.date.issued2025-
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/170166-
dc.description.abstractPenurunan efektivitas mesin akibat tingginya downtime berdampak pada rendahnya produktivitas. Studi ini menganalisis penerapan Total Productive Maintenance (TPM) pada lini produksi Section Solid di PT XYZ, khususnya mesin Kikusui 36 HUK-ACW. Metode yang digunakan mencakup analisis delapan pilar TPM, budaya kerja 5S, perhitungan OEE, analisis keandalan mesin (MTBF, MTTR, MDT), serta identifikasi akar masalah dengan diagram fishbone. Rata-rata nilai OEE sebesar 81%, dengan Availability dan Quality sesuai standar, namun Performance masih rendah. Masalah utama berasal dari kerusakan punch/die, motor, dan gearbox. Untuk mengatasinya, diterapkan One Point Lesson (OPL) guna meningkatkan pemahaman teknis operator. Penerapan TPM secara menyeluruh terbukti efektif dalam meningkatkan keandalan mesin dan efisiensi produksi.-
dc.description.abstractA decline in machine effectiveness due to high downtime often leads to reduced productivity. This study analyzes the implementation of Total Productive Maintenance (TPM) on the Section Solid production line at PT XYZ, focusing on the Kikusui 36 HUK-ACW machine. The methods include analysis of the eight TPM pillars, 5S practices, OEE calculation, reliability metrics (MTBF, MTTR, MDT), and root cause identification using a fishbone diagram. The average OEE was 81%, with Availability and Quality meeting standards, while Performance lagged. Key issues involved failures in punch/die components, motors, and gearboxes. To address these, One Point Lessons (OPL) were introduced to enhance operators’ technical understanding. The comprehensive TPM approach proved effective in improving machine reliability and production efficiency.-
dc.description.sponsorshipnull-
dc.language.isoid-
dc.publisherIPB Universityid
dc.titlePenerapan Total Productive Maintenance Pada Lini Produksi Section Solid di PT XYZid
dc.title.alternativeImplementation of Total Productive Maintenance on the Solid Section Production Line at PT XYZ-
dc.typeTugas Akhir-
dc.subject.keywordfishboneid
dc.subject.keywordOEEid
dc.subject.keywordOPLid
dc.subject.keywordReliability maintenanceid
dc.subject.keywordTPMid
Appears in Collections:UT - Industrial Management

Files in This Item:
File Description SizeFormat 
cover_J0311211191_7989cf9f4226414e946c340e66d0fb0a.pdfCover547.53 kBAdobe PDFView/Open
fulltext_J0311211191_b5f2f940c6dd4d67bf4fd6d015c6c16c.pdf
  Restricted Access
Fulltext1.18 MBAdobe PDFView/Open
lampiran_J0311211191_c4e606be3e954cc4b9300871053cb2cd.pdf
  Restricted Access
Lampiran506.7 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.