Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/169613
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorWidodo, Slamet-
dc.contributor.authorRahman, Rafly Aulia-
dc.date.accessioned2025-08-16T02:56:59Z-
dc.date.available2025-08-16T02:56:59Z-
dc.date.issued2025-
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/169613-
dc.description.abstractIndustri makanan olahan seperti nugget memiliki permintaan tinggi sehingga memerlukan proses produksi yang efisien. PT XYZ menghadapi masalah lembur akibat adanya bottleneck pada lini produksi. Penelitian ini bertujuan mengidentifikasi proses yang menjadi, menganalisis penyebabnya, dan memberikan rekomendasi perbaikan. Metode yang digunakan meliputi Value Stream Mapping (VSM), Process Activity Mapping (PAM), fishbone diagram, dan 5 Whys. Hasil penelitian menunjukkan bahwa bottleneck terjadi pada proses pengukusan dan pemotongan karena kapasitas mesin terbatas, metode kerja kurang efisien, serta jumlah tenaga kerja yang minim. Rekomendasi perbaikan meliputi penambahan tenaga kerja, pengaturan shift, penggunaan troli, dan pemeliharaan mesin. Implementasi perbaikan menurunkan cycle time dari 8 jam 51 menit menjadi 7 jam 54 menit, menghilangkan lembur, dan meningkatkan efisiensi proses dari 94,25% menjadi 96,62%.-
dc.description.abstractThe processed food industry, such as nuggets, has high demand, requiring efficient production processes. PT XYZ faces overtime issues due to bottlenecks in its production line. This study aims to identify the bottleneck process, analyze its causes, and provide improvement recommendations. The methods used include Value Stream Mapping (VSM), Process Activity Mapping (PAM), fishbone diagram, and 5 Whys. The results showed that bottlenecks occurred in steaming and cutting processes due to limited machine capacity, inefficient work methods, and lack of manpower. Recommendations include adding workers, adjusting shifts, using trolleys, and maintaining machines. The implementation reduced cycle time from 8 hours 51 minutes to 7 hours 54 minutes, eliminated overtime, and improved process efficiency.-
dc.description.sponsorshipnull-
dc.language.isoid-
dc.publisherIPB Universityid
dc.titleAnalisis Bottleneck pada Proses Produksi Nugget di PT XYZid
dc.title.alternativeBottleneck Analysis in Nugget Production Process at PT XYZ-
dc.typeTugas Akhir-
dc.subject.keywordbottleneckid
dc.subject.keywordnuggetid
dc.subject.keywordValue Stream Mappingid
dc.subject.keywordProduction efficiencyid
Appears in Collections:UT - Supervisor of Food Quality Assurance

Files in This Item:
File Description SizeFormat 
cover_J0305211120_c006328be71e4544b183065b234816d5.pdfCover2.58 MBAdobe PDFView/Open
fulltext_J0305211120_fd0f087303f04fe597db4f7b6189f61e.pdf
  Restricted Access
Fulltext2.86 MBAdobe PDFView/Open
lampiran_J0305211120_1d9f21c28db84d6d8faf1eafc7c9a674.pdf
  Restricted Access
Lampiran2.07 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.