Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/168708
Title: Desain Tata Letak Fasilitas Produksi dan Analisis Biaya Produksi Edible Coating Bubuk di PT XYZ
Other Titles: 
Authors: Machfud
Yuliasih, Indah
Bagaskara, Farhan
Issue Date: 2025
Publisher: IPB University
Abstract: PT XYZ sedang mengembangkan produk edible coating bubuk untuk mengatasi permasalahan pada produk edible coating cair yang telah di produksi. Pengembangan produk edible coating bubuk mengalami tantangan dari aspek teknis dan ekonomi. Tantangan yang terjadi berupa keterbatasan luas fasilitas produksi serta biaya produksi yang belum teridentifikasi. Penelitian ini bertujuan untuk merancang tata letak fasilitas produksi edible coating bubuk yang terintegrasi dengan fasilitas produksi cair yang telah ada di PT XYZ tanpa mengubah struktur bangunan serta menganalisis biaya produksi melalui perhitungan harga pokok produksi. Perancangan tata letak dilakukan menggunakan pendekatan Systematic Layout Planning dengan bantuan software BLOCPLAN dan analisis biaya dilakukan dengan metode full costing. Hasil penelitian menunjukkan bahwa. Tata letak usulan berhasil mengintegrasikan proses produksi bubuk dan cair secara efisien dalam keterbatasan ruang yang tersedia dengan meminimalkan backtracking dan risiko kontaminasi silang. Skenario produksi terintegrasi menghasilkan biaya per unit yang lebih rendah dengan bahan baku sebagai penyumbang biaya terbesar.
PT XYZ is currently developing a powdered edible coating product to address the challenges associated with its previously produced liquid edible coating. The development of the powdered edible coating faces both technical and economic challenges. These include limitations in production facility space and unidentified production costs. This study aims to design a powdered edible coating production layout that integrates with the existing liquid coating production facility at PT XYZ without altering the building structure and to analyze production costs through the calculation of the cost of goods manufactured. Facility layout design was carried out using the Systematic Layout Planning approach with the assistance of BLOCPLAN software, while the Cost analysis was conducted using the full costing method. The results show that the proposed layout successfully integrates powdered and liquid production processes within the available space constraints, minimizing backtracking and the risk of cross-contamination. The integrated production scenario leads to a lower unit cost, with raw materials contributing the most to total costs.
URI: http://repository.ipb.ac.id/handle/123456789/168708
Appears in Collections:UT - Agroindustrial Technology

Files in This Item:
File Description SizeFormat 
cover_F3401211083_e689eeadcef246258093b5ec41c2d261.pdfCover426.26 kBAdobe PDFView/Open
fulltext_F3401211083_5ed08a86ac1941c0bacf5e3e14c176be.pdf
  Restricted Access
Fulltext1.68 MBAdobe PDFView/Open
lampiran_F3401211083_3d9e2c7dd6294bc1b0ece6ffe079dc45.pdf
  Restricted Access
Lampiran804.57 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.