Please use this identifier to cite or link to this item:
http://repository.ipb.ac.id/handle/123456789/168588| Title: | Penerapan Metode Job Order Costing dalam Menghitung Biaya Proyek pada CV Gandrung Wangi Berbasis Software Microsoft Excel |
| Other Titles: | Application of Job Order Costing Method in Calculating Project Costs at CV Gandrung Wangi Based on Microsoft Excel Software |
| Authors: | Haryono, Pinggir Nuh Ulumuddin, Muhammad Nur Fajril |
| Issue Date: | 2025 |
| Publisher: | IPB University |
| Abstract: | CV Gandrung Wangi adalah perusahaan yang bergerak di bidang jasa konstruksi, khususnya dalam pembangunan gedung dan instalasi listrik. Dalam operasional proyek, perusahaan mengalami tantangan dalam dengan sumber daya manusia, terutama dalam memahami sistem pencatatan biaya konstruksi, pencatatan dan pemantauan anggaran yang berdampak pada efisiensi pengelolaan biaya. Laporan proyek akhir ini bertujuan merancang sistem pencatatan biaya operasional proyek konstruksi menggunakan metode Job Order Costing berbasis Microsoft Excel untuk mempermudah input data dan biaya bahan baku, biaya tenaga kerja langsung, serta biaya overhead proyek. Metode yang digunakan meliputi analisis kebutuhan, perancangan sistem, pembuatan aplikasi, dan uji coba pada CV Gandrung Wangi. Diharapkan sistem ini dapat meningkatkan efisiensi operasional, meminimalisir kesalahan pencatatan, serta memudahkan pemilik usaha dalam mengakses informasi secara akurat dan real-time, sehingga mampu meningkatkan daya saing CV Gandrung Wangi. CV Gandrung Wangi is a company engaged in construction services, particularly in building construction and electrical installation. In project operations, the company experiences challenges with human resources, especially in understanding the construction cost recording system, recording and monitoring budgets that have an impact on the efficiency of cost management. This final project report aims to design a construction project operational cost recording system using the Microsoft Excel-based Job Order Costing method to facilitate data input and raw material costs, direct labor costs, and factory overhead costs. The methods used include needs analysis, system design, application development, and testing at CV Gandrung Wangi. It is expected that this system can improve operational efficiency, minimize recording errors, and facilitate business owners in accessing accurate and real-time information, so as to increase the competitiveness of CV Gandrung Wangi. |
| URI: | http://repository.ipb.ac.id/handle/123456789/168588 |
| Appears in Collections: | UT - Accounting |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| cover_J0314211236_cbb1f993b3a844c388e939df68dc0e3d.pdf | Cover | 797.33 kB | Adobe PDF | View/Open |
| fulltext_J0314211236_ccf95f7fd93d4528a1a7e46886b6399c.pdf Restricted Access | Fulltext | 1.6 MB | Adobe PDF | View/Open |
| lampiran_J0314211236_e8ddd8e7eb1548c884cc8b92d53ce77b.pdf Restricted Access | Lampiran | 446.78 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.