Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/166186
Title: Optimalisasi Pengelolaan Waste Reject Produk BOPP Pada Line 6 dan 7 di PT XYZ
Other Titles: Optimization of BOPP Product Reject Waste Management on Line 6 and 7 at PT XYZ
Authors: Widyastuti, Hardiana
Mamesah, Kezia Christabelle
Issue Date: 2025
Publisher: IPB University
Abstract: KEZIA CHRISTABELLE MAMESAH. Optimalisasi Pengelolaan Waste reject Produk BOPP Pada Line 6 Dan 7 di PT XYZ (Optimization of BOPP Product Reject Waste Management on Line 6 and 7 at PT XYZ). Dibimbing oleh HARDIANA WIDYASTUTI. PT XYZ merupakan perusahaan manufaktur yang memproduksi Flexible Packaging. Penelitian ini bertujuan untuk mengoptimalkan pengelolaan waste reject produk BOPP pada Line 6 dan 7 di PT XYZ, yang mengalami penumpukan limbah sehingga mengganggu kelancaran aktivitas produksi. Permasalahan utama yang diidentifikasi adalah tidak adanya standar pengelolaan waste yang seragam serta keterbatasan waktu operator dalam menangani waste karena bukan merupakan tugas utama mereka. Metode Lean Manufacturing digunakan sebagai pendekatan utama dalam penelitian ini, dengan penerapan Value Stream Mapping (VSM), Process Activity Mapping (PAM), dan 5 whys analysis. Hasil analisis menunjukkan adanya pemborosan waktu, tenaga kerja, dan aktivitas non-Value Added yang signifikan. Usulan perbaikan berupa instalasi mesin otomatis multifungsi diharapkan dapat mengurangi pemborosan dan meningkatkan efisiensi pengelolaan waste. Future State Mapping menggambarkan kondisi ideal dengan proses yang lebih terintegrasi dan efisien, serta penurunan kebutuhan tenaga kerja tanpa mengurangi produktivitas.
KEZIA CHRISTABELLE MAMESAH. Optimization of BOPP Product Reject Waste Management on Line 6 and 7 at PT XYZ. Supervised by HARDIANA WIDYASTUTI. PT XYZ is a manufacturing company specializing in the production of flexible packaging. This study aims to optimize the management of BOPP product reject waste on Line 6 and 7 at PT XYZ, where waste accumulation has disrupted the smooth flow of production activities. The main issues identified include the absence of standardized waste management procedures and limited operator time to handle waste, as it is not their primary responsibility. Lean Manufacturing methods were applied as the main approach in this study, utilizing Value Stream Mapping (VSM), Process Activity Mapping (PAM), and 5 whys analysis. The analysis revealed significant waste in time, labor, and non-value-added activities. The proposed improvement involves the installation of a multifunctional automatic machine expected to reduce waste and enhance waste management efficiency. The Future State Mapping describes an ideal condition with a more integrated and efficient process, as well as reduced labor requirements without decreasing productivity.
URI: http://repository.ipb.ac.id/handle/123456789/166186
Appears in Collections:UT - Industrial Management

Files in This Item:
File Description SizeFormat 
cover_J0311211175_afec424f960f4a28b9f729f0405c5a87.pdfCover328.48 kBAdobe PDFView/Open
fulltext_J0311211175_66bc325c66354d46a9095ebeabdea198.pdf
  Restricted Access
Fulltext725.63 kBAdobe PDFView/Open
lampiran_J0311211175_24168847b469493988f16e6d5ed7da58.pdf
  Restricted Access
Lampiran334.12 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.