Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/165884
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorIndrawan, Purana-
dc.contributor.authorMAHARANI, KAYLA-
dc.date.accessioned2025-07-26T02:36:01Z-
dc.date.available2025-07-26T02:36:01Z-
dc.date.issued2025-
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/165884-
dc.description.abstractKAYLA MAHARANI. Pengukuran Waktu Baku pada Proses Produksi Part Interior di PT XYZ. Dibimbing oleh PURANA INDRAWAN. PT XYZ merupakan perusahaan yang bergerak di industri otomotif yang menghasilkan produk kendaraan yang sangat beragam, perusahaan ini bergerak dalam tiga bidang bisnis yaitu karoseri, fabrikasi, serta assembly. Berdasarkan hasil observasi dan wawancara penulis, terdapat permasalahan pada penetapan waktu kerja yang berbeda dengan waktu aktual yang menyebabkan terhentinya proses produksi pada bagian trimming karena terdapat keterlambatan komponen yang diproduksi oleh bagian interior mobil. Dengan adanya penelitian ini dilakukan perhitungan waktu baku dengan hasil perhitungan 10,5 menit yang dimana dapat dijadikan sebagai evaluated standard time dan dapat menerapkan continuous improvement dengan instruksi kerja sebagai output proyek akhir. Kata Kunci: Instruksi Kerja, Pengukuran Waktu Kerja, Standard Time, Stopwatch-
dc.description.abstractKAYLA MAHARANI. Measuring Standard Time for Interior Part Production Process at PT XYZ. Supervised by PURANA INDRAWAN. PT XYZ is a company engaged in the automotive industry that produces a wide variety of vehicle products. This company is engaged in three business areas, namely bodywork, fabrication, and assembly. Based on the results of the author's observations and interviews, there were problems in determining working hours that were different from the actual time, which caused the production process in the trimming section to stop because there was a delay in components produced by the car interior section. With this research, a standard time calculation was carried out with a calculation result of 10.5 minutes, which can be used as an evaluated standard time and implemented for continuous improvement with work instructions as the final project output. Keywords: Standard Time, Stopwatch, Work Instructions, Work Time Measurement-
dc.description.sponsorshipnull-
dc.language.isoid-
dc.publisherIPB Universityid
dc.titlePengukuran Waktu Baku pada Proses Produksi Part Interior di PT XYZid
dc.title.alternativeMeasuring Standard Time for Interior Part Production Process at PT XYZ-
dc.typeTugas Akhir-
dc.subject.keywordStandard Timeid
dc.subject.keywordStopwatchid
dc.subject.keywordWork Instructionsid
dc.subject.keywordWork Time Measurementid
Appears in Collections:UT - Industrial Management

Files in This Item:
File Description SizeFormat 
cover_J0311211173_a8ac7f6d64fa48a5b9c91ccb6e2b2be2.pdfCover537.39 kBAdobe PDFView/Open
fulltext_J0311211173_27d2c53d5254461c8fbbbd049a58de3d.pdf
  Restricted Access
Fulltext1.29 MBAdobe PDFView/Open
lampiran_J0311211173_b060cc62812d4c8ab284e0134d5d6fa9.pdf
  Restricted Access
Lampiran808.5 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.