Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/165657
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorSinaga, Antonya Rumondang-
dc.contributor.authorRAMDANI, IRFAN NAUFAL-
dc.date.accessioned2025-07-23T07:01:44Z-
dc.date.available2025-07-23T07:01:44Z-
dc.date.issued2025-
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/165657-
dc.description.abstractHydraulic Drilling Rig Zoomlion ZR160A-1 merupakan alat berat di PT Acset Indonusa Tbk yang mengalami tingkat downtime tertinggi sepanjang Januari–Juni 2024. Penelitian ini bertujuan untuk menganalisis penerapan Total Productive Maintenance dalam menurunkan downtime, meningkatkan keandalan alat, serta memperbaiki indikator produktivitas alat berat. Metode yang digunakan mencakup perhitungan MTBF, MTTR, PA, MA, dan EU. Hasil penelitian menunjukkan peningkatan nilai MTBF dan penurunan MTTR dari waktu ke waktu, serta capaian PA dan MA yang melampaui target perusahaan. Temuan penting lainnya meliputi perbaikan sistem pemeliharaan melalui digitalisasi form P2H dan Timesheet, serta pengembangan One Point Lesson (OPL) untuk edukasi teknis. Penerapan TPM juga diperkuat dengan implementasi budaya kerja 5S yang masih perlu ditingkatkan di lapangan. Secara keseluruhan, penerapan TPM terbukti mampu memberikan dampak positif terhadap penurunan waktu downtime.-
dc.description.abstractThe Zoomlion ZR160A-1 Hydraulic Drilling Rig is a heavy equipment unit at PT Acset Indonusa Tbk that recorded the highest downtime from January to June 2024. This study aims to analyze the implementation of Total Productive Maintenance in reducing downtime, improving equipment reliability, and enhancing heavy equipment productivity indicators. The methods used include calculations of MTBF, MTTR, PA, MA, and EU. The results show an increase in MTBF and a decrease in MTTR over time, with PA and MA exceeding the company’s target. Other key findings include improvements in the maintenance system through the digitalization of P2H and Timesheet forms, as well as the development of One Point Lessons (OPL) for technical education. TPM implementation is also supported by the application of the 5S work culture, which still requires further improvement on-site. Overall, TPM has been proven effective, with a positive contribution to reducing downtime duration.-
dc.description.sponsorshipnull-
dc.language.isoid-
dc.publisherIPB Universityid
dc.titlePenerapan Total Productive Maintenance pada Hydraulic Drilling Rig Zoomlion ZR60A-1 di PT Acset Indonusa Tbkid
dc.title.alternativenull-
dc.typeTugas Akhir-
dc.subject.keywordDowntimeid
dc.subject.keywordTotal Productive Maintenance (TPM)id
dc.subject.keywordHydraulic Drilling Rigid
dc.subject.keywordHeavy Equipment productivity indicatorid
dc.subject.keywordMaintenanceid
Appears in Collections:UT - Industrial Management

Files in This Item:
File Description SizeFormat 
cover_J0311211013_a46501fde8e94239bcdc01925de50209.pdfCover665.1 kBAdobe PDFView/Open
fulltext_J0311211013_128669d3560340508eccada4d4ef9327.pdf
  Restricted Access
Fulltext1.84 MBAdobe PDFView/Open
lampiran_J0311211013_f5999d15171643278d5ff0316ca73eb7.pdf
  Restricted Access
Lampiran2.02 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.