Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/163049
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorSetiawan, Budi Indra-
dc.contributor.authorQodry, Muhammad Hafiz-
dc.date.accessioned2025-06-26T00:28:05Z-
dc.date.available2025-06-26T00:28:05Z-
dc.date.issued2025-
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/163049-
dc.description.abstractPemanfaatan air yang efisien menjadi aspek penting dalam konservasi air salah satunya melalui pembuatan embung. Penelitian ini bertujuan merancang embung sebagai solusi penyimpanan cadangan air untuk mendukung kegiatan pertanian di kebun percobaan IPB. Lokasi penelitian terletak di salah satu unit Kebun Percobaan Babakan Sawah Baru, IPB. Data yang digunakan pada penelitian ini adalah data sekunder berupa data curah hujan dan klimatologi Bogor 20 tahun terakhir, dan data elevasi lokasi penelitian. Prosedur penelitian mencakup beberapa tahapan, yaitu identifikasi lokasi penelitian, studi literatur, pengumpulan data, analisis data, perancangan desain teknis, dan rencana snggaran biaya. Bentuk embung mengikuti garis kontur pada elevasi 177.25-179.75 mdpl dengan kedalaman 2,5 m dan volume tampungan embung sebesar 1228 m3. Saluran pelimpah didesain berbentuk trapesium dengan dasar 0,9 m, puncak 1,8 m, dan kedalaman 0,4 m. Pintu sorong menggunakan baja dengan tinggi 1,9 m, lebar dan tinggi daun pintu masing-masing 0,5 m. Anggaran biaya yang diperlukan untuk pembangunan embung di Desa Babakan ini sebesar Rp 1.365.000.000,-.-
dc.description.abstractEfficient water utilisation is an important aspect of water conservation, one of which is through the creation of reservoirs. This research aims to design a reservoir as a solution to store water reserves to support agricultural activities in the experimental garden of IPB. The research location is located in one of the units of Babakan Sawah Baru Experimental Farm, IPB. The data used in this research are secondary data in the form of Bogor rainfall and climatology data for the last 20 years, and elevation data of the research location. The research procedure includes several stages, namely identification of the research location, literature study, data collection, data analysis, technical design, and cost budget plan. The shape of the reservoir follows the contour line at elevation 177.25-179.25 m above sea level with a depth of 2.5 m and a reservoir storage volume of 1228 m3. The spillway channel was designed in a trapezoidal shape with a base of 0.9 m, a peak of 1.8 m, and a depth of 0.4 m. The sluice gate uses steel with a height of 1.9 m, width and height of the door leaf of 0.5 m each. The cost budget required for the construction of the reservoir in Babakan Village is IDR 1,365,000,000.-
dc.description.sponsorshipnull-
dc.language.isoid-
dc.publisherIPB Universityid
dc.titlePerencanaan Desain Embung di Desa Babakan Kecamatan Dramaga Bogorid
dc.title.alternativenull-
dc.typeSkripsi-
dc.subject.keywordtopographyid
dc.subject.keywordRainfallid
dc.subject.keywordwater conservationid
dc.subject.keywordreservoirid
dc.subject.keywordwater balanceid
Appears in Collections:UT - Civil and Environmental Engineering

Files in This Item:
File Description SizeFormat 
cover_F4401211048_65150ccc5b8a4ede8ed2e70eb536e1c9.pdfCover525.66 kBAdobe PDFView/Open
fulltext_F4401211048_087723dd50ca494b9fedf09c51a5bc41.pdf
  Restricted Access
Fulltext1.62 MBAdobe PDFView/Open
lampiran_F4401211048_d00293a0da824b039606ecf97f27933d.pdf
  Restricted Access
Lampiran1.19 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.