http://repository.ipb.ac.id/handle/123456789/162551| Title: | Analisis Perawatan Mesin Stamp Chassis Menggunakan Metode Reliability Centered Maintenance (RCM) dan FMEA di PT XYZ |
| Other Titles: | |
| Authors: | Ismayana, Andes Amru, Luthfiana Syahida |
| Issue Date: | 2025 |
| Publisher: | IPB University |
| Abstract: | Mesin Stamp Chassis sering mengalami kerusakan yang menyebabkan
terhambatnya keberlangsungan operasional. Tujuan dari penelitian ini adalah untuk
menentukan tindakan pada komponen kritis dan menentukan interval perawatan
dengan metode RCM dan FMEA. Dari hasil analisis FMEA menunjukkan bahwa
clamper memiliki nilai RPN sebesar 336, power supply sebesar 120, PLC set
sebesar 168, solenoid valve sebesar 150, xy belt dengan sebesar 240, spring balance
sebesar 140, dan RPN terendah yaitu control cable sebesar 36. Setelah dilakukan
perhitungan menggunakan RCM, jadwal pemeliharaan mesin Stamp Chassis pada
komponen power supply dilakukan pada hari ke- 59 dengan tindakan pemeliharaan
berupa condition directed, PLC set pada hari ke- 8 dengan pemeliharaan berupa
finding failure, control cable pada hari ke- 29 dengan tindakan berupa condition
directed, Clamper pada hari ke- 16 dengan pemeliharaan berupa time directed,
solenoid valves pada hari ke- 20 dengan tindakan berupa time directed, xy belt pada
hari ke- 47 dengan tindakan pemeliharaan berupa time directed, spring balance
pada hari ke- 117 dengan tindakan pemeliharaan berupa finding failure. Stamp Chassis machines often experience damage which causes obstacles to operational continuity. The purpose of this research is to determine the action on critical components and determine maintenance intervals with RCM and FMEA methods. The results of the FMEA analysis show that the clamper has an RPN value of 336, power supply of 120, PLC set of 168, solenoid valve of 150, xy belt with 240, spring balance of 140 [U1], and the lowest RPN is the control cable of 36. After calculating using RCM, the maintenance schedule for the Stamp Chassis machine on the power supply component is carried out on day 59 with maintenance action in the form of condition directed, PLC set on day 8 with maintenance in the form of finding failure, control cable on day 29 with action in the form of condition directed, Clamper on day 16 with maintenance in the form of time directed, solenoid valves on day 20 with action in the form of time directed, xy belt on day 47 with maintenance action in the form of time directed, spring balance on day 117 with maintenance action in the form of finding failure. |
| URI: | http://repository.ipb.ac.id/handle/123456789/162551 |
| Appears in Collections: | UT - Industrial Management |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| cover_J0311211039_4fadce00eb774307b1881bb53f6f7e4f.pdf | Cover | 817.6 kB | Adobe PDF | View/Open |
| fulltext_J0311211039_693ba88cf86e43da9d4100060abd9859.pdf Restricted Access | Fulltext | 2.65 MB | Adobe PDF | View/Open |
| lampiran_J0311211039_9a04cbd1695a4b7a8f5335ed0605c339.pdf Restricted Access | Lampiran | 5.45 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.