Title: Aplikasi SWMM 5.2 untuk Perencanaan Drainase Sistem Polder di RW 05 Kelurahan Bantargebang Kota Bekasi
Other Titles: Application of SWMM 5.2 for Polder Drainage System Planning in RW 05 Bantargebang Village, Bekasi City
Authors: Pribadi, Andik
Alli, Zuhdi Abyan
Issue Date: 2025
Publisher: IPB University
Abstract: Banjir secara berulang kali terjadi dan mengganggu produktivitas warga di RW 05, Kelurahan Bantargebang, Kota Bekasi. Berdasarkan hasil laporan terakhir, banjir terjadi pada tanggal 27 Februari 2025 dengan ketinggian mencapai 40 cm. Dugaan terjadinya banjir dikarenakan saluran drainase dan pengaliran secara gravitasi terhambat. Penelitian ini bertujuan melakukan pengendalian banjir tersebut dengan sistem drainase polder menggunakan SWMM 5.2. Metode yang digunakan meliputi penentuan DTA (daerah tangkapan air) dengan ArcGis, analisis hidrologi, dan pemodelan dengan SWMM 5.2. Data digunakan yakni data primer berupa dimensi existing saluran dan data sekunder berupa DEMNAS (Digital Elevation Model Nasional), RBI (Rupa Bumi Indonesia), curah hujan CHIRPS (Climate Hazards Group InfraRed Precipitation with Station data), dan curah hujan BMKG. Hasil yang didapatkan berupa DTA seluas 26,5 Ha dengan debit banjir puncak 0,2 m3/s. Oleh karena itu, diperlukan perbaikan pada dua saluran dan lima node eksisting, pembangunan kolam polder seluas 1500 m2 dengan kedalaman 4 meter dan pompa kapasitas 0,6 m3/s, dan pembangunan saluran pembuang sepanjang 1060 m. Desain tersebut disimpulkan dapat mengatasi banjir maksimum.
Floods occur repeatedly and disrupt the productivity of residents in RW 05, Bantargebang Village, Bekasi City. Based on the latest report, the flood occurred on February 27, 2025 with a height reaching 40 cm. The alleged flood occurred because the drainage channel and gravity flow were blocked. This study aims to control the flood with a polder drainage system using SWMM 5.2. The methods used include determining the DTA (water catchment area) with ArcGis, hydrological analysis, and modeling with SWMM 5.2. The data used are primary data in the form of existing channel dimensions and secondary data in the form of DEMNAS (Digital Elevation Model Nasional), RBI (Rupa Bumi Indonesia), CHIRPS (Climate Hazards Group InfraRed Precipitation with Station data) rainfall, and BMKG rainfall. The results obtained are in the form of a DTA of 26.5 Ha with a peak flood discharge of 0.2 m3/s. Therefore, it is necessary to repair two channels and five existing nodes, construct a 1500 m2 polder pond with a depth of 4 meters and a pump capacity of 0.6 m3/s, and construct a 1060 m long drainage channel. The design is concluded to be able to handle maximum flooding.
URI: http://repository.ipb.ac.id/handle/123456789/161835
Appears in Collections:UT - Civil and Environmental Engineering

Files in This Item:
File Description SizeFormat 
cover_F4401211044_abdd9b878e1f4be68122741a28f5ac72.pdfCover3.21 MBAdobe PDFView/Open
fulltext_F4401211044_ad668cf9e8a542528870e97c742e88c3.pdf
  Restricted Access
Fulltext6.51 MBAdobe PDFView/Open
lampiran_F4401211044_0facc2aa32414061a771578f1233d843.pdf
  Restricted Access
Lampiran3.47 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.