Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/159560
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorMayyani, Hidayatul-
dc.contributor.advisorSupriyo, Prapto Tri-
dc.contributor.authorSyahrul-
dc.date.accessioned2024-11-29T06:52:23Z-
dc.date.available2024-11-29T06:52:23Z-
dc.date.issued2024-
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/159560-
dc.description.abstractKota Bogor merupakan salah satu kota yang berada di provinsi Jawa Barat dengan jumlah penduduk yang banyak. Pertumbuhan penduduk di kota Bogor bertambah setiap harinya, sehingga menyebabkan mobilitas semakin meningkat dan menyebabkan kemacetan. Salah satu upaya Pemerintah Kota Bogor dengan melakukan pergantian angkutan kota menjadi bentuk angkutan massal perkotaan dengan konsep Bus Rapid Transit (BRT). Angkutan massal ini dinamakan BisKita Trans Pakuan Bogor sebagai upaya mengatasi permasalahan kemacetan. Dalam karya ilmiah ini, akan dibahas masalah optimasi penjadwalan BisKita Trans Pakuan Bogor pada koridor 2. Masalah penjadwalan BisKita Trans Pakuan Bogor diformulasikan ke dalam Integer Linear Programming (ILP) dan pencarian solusinya akan diselesaikan menggunakan software MiniZinc. Model dibuat dengan memperhatikan partisi waktu, rute bus, banyaknya bus yang beroperasi, jam kerja pramudi, banyaknya pegawai serta lamanya perjalanan dalam tiap partisi waktu. Hasil keluaran dari model ini berupa optimasi banyaknya rit bus dan biaya operasional minimum yang dikeluarkan oleh perusahaan. Banyaknya rit yang dihasilkan akan digunakan untuk penyusunan jadwal keberangkatan bus.-
dc.description.abstractBogor City is one of the cities in West Java province with a large population. Population growth in the city of Bogor increases every day, causing increased mobility and causing congestion. One of the efforts of the Bogor City Government is to change city transportation into a form of urban mass transportation with the concept of Bus Rapid Transit (BRT). This mass transportation is called BisKita Trans Pakuan Bogor as an effort to overcome congestion problems. In this paper, the problem of optimizing the BisKita Trans Pakuan Bogor timetabling in corridor 2. The BisKita Trans Pakuan Bogor timetabling is formulated into Integer Linear Programming (ILP) and the solution search will be solved using MiniZinc software. The model is made by considering the time partition, bus routes, the number of buses operating, the working hours of the driver, the number of employees and the length of the trip in each time partition. The output of this model is the optimization of the number of bus rites and the minimum operating costs incurred by the company. The number of rites generated will be used for the preparation of the bus timetabling.-
dc.description.sponsorshipnull-
dc.language.isoid-
dc.publisherIPB Universityid
dc.titleOptimasi Penjadwalan Biskita Trans Pakuan Bogor di Koridor-2 dengan Integer Linear Programmingid
dc.title.alternativeOptimization of Biskita Trans Pakuan Bogor Timetabling in Corridor-2 with Integer Linear Programming-
dc.typeSkripsi-
dc.subject.keywordinteger linear programmingid
dc.subject.keywordoptimizationid
dc.subject.keywordBRTid
dc.subject.keywordbus timetablingid
Appears in Collections:UT - Mathematics

Files in This Item:
File Description SizeFormat 
cover_G5401201004_3e2b2cf9c2d14cdbab0431971ebfbde8.pdfCover620.25 kBAdobe PDFView/Open
fulltext_G5401201004_bd32fbc179c54fcc8c115f0112743456.pdf
  Restricted Access
Fulltext1.61 MBAdobe PDFView/Open
lampiran_G5401201004_cc1a6ee4af72433f85a6014b671c0a22.pdf
  Restricted Access
Lampiran581.69 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.