Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/158182
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorSuwarna, Ujang-
dc.contributor.authorIrwansyah, Aditya Sandy-
dc.date.accessioned2024-08-22T03:50:30Z-
dc.date.available2024-08-22T03:50:30Z-
dc.date.issued2024-
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/158182-
dc.description.abstractPenyaradan merupakan salah satu tahapan dalam pemanenan kayu. Produktivitas dan biaya penyaradan menjadi informasi yang diperlukan untuk dapat mengoptimalkan kegiatan penyaradan. Penelitian bertujuan menganalisis besarnya produktivitas dan biaya yang dikeluarkan pada kegiatan penyaradan manual kayu Acacia mangium di BKPH Parung Panjang, KPH Bogor. Truk digunakan sebagai supportive work selama proses penyaradan. Waktu kerja diukur dengan metode kumulatif dan nuls stop. Produktivitas didapatkan melalui volume kayu dan waktu kerja yang dihasilkan. Biaya didapatkan dari hasil wawancara dengan pekerja. Hasil penelitian mengelompokkan produktivitas penyaradan yang dihasilkan menjadi produktivitas efektif sebesar 3,25 m3/jam, produktivitas aktual sebesar 2,20 m3/jam, dan produktivitas standar sebesar 2,04 m3/jam. Hasil tersebut menunjukkan delay yang terjadi menurunkan produktivitas sebesar 32,31% dari produktivitas aktual. Biaya penyaradan apabila Perhutani memiliki truk sendiri yaitu Rp65.719,27/m3 sedangkan tarif upah borongan yang ditetapkan yaitu Rp71.900/m3. Berdasarkan analisis biaya tersebut, apabila Perhutani memiliki truk sendiri dapat menghemat biaya Rp6.180,73/m3. Produktivitas dan biaya penyaradan dapat dioptimalkan dengan mengurangi waktu delay yang dapat dihindari selama proses penyaradan.-
dc.description.abstractSkidding is one of the stages in wood harvesting. The productivity and costs of skidding are necessary information to optimize skidding activities. The research aims to analyze the amount of productivity and costs incurred in manual skidding activities for Acacia mangium wood at BKPH Parung Panjang, KPH Bogor. Trucks are used as supportive work during the skidding process. Working time is measured by cumulative and zero stop methods. Productivity is obtained through the volume of wood and working time produced. Costs are obtained from interviews with workers. The research results grouped the resulting skidding productivity into effective productivity of 3.25 m3/hour, actual productivity of 2.20 m3/hour, and standard productivity of 2.04 m3/hour. These results show that the delay that occurred reduced productivity by 32.31% of actual productivity. The cost of skidding if Perhutani has its own truck is Rp65,719.27/m3, while the piece rate set is Rp71,900/m3. Based on this cost analysis, if Perhutani had its own trucks it could save costs of Rp6,180.73/m3. Skidding productivity and costs can be optimized by reducing avoidable delays during the skidding process.-
dc.description.sponsorshipnull-
dc.language.isoid-
dc.publisherIPB Universityid
dc.titleProduktivitas dan Biaya Penyaradan Manual Kayu Acacia mangium di BKPH Parung Panjang KPH Bogorid
dc.title.alternativeProductivity and Costs of Acacia mangium Wood Manual Skidding at BKPH Parung Panjang KPH Bogor-
dc.typeSkripsi-
dc.subject.keywordakasiaid
dc.subject.keywordBiayaid
dc.subject.keywordpenyaradanid
dc.subject.keywordproduktivitasid
dc.subject.keywordwaktu kerjaid
Appears in Collections:UT - Forest Management

Files in This Item:
File Description SizeFormat 
cover_E1401201012_25acdc8e72004589814a4cc1a0811857.pdfCover402.16 kBAdobe PDFView/Open
fulltext_E1401201012_bb67d34eec8e439e8e8128acd5cc75e8.pdf
  Restricted Access
Fulltext1.1 MBAdobe PDFView/Open
lampiran_E1401201012_68c7604251944513b64c658cec7827cd.pdf
  Restricted Access
Lampiran169.17 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.