Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/154674
Title: Perbaikan Palletizer 67I-PA1 untuk Meningkatkan Running Hour dengan Metode DMAIC pada PT SBI Narogong Plant
Other Titles: Repair of 67I-PA1 Palletizer to Increase Running Hour with DMAIC Method at PT SBI Narogong Plant
Authors: Hidayat, Agung Prayudha
Deviani, Rachma
Issue Date: 2024
Publisher: IPB University
Abstract: Penulisan proyek akhir dibuat untuk melakukan penelitian terhadap suatu permasalahan yang ada di perusahaan dan diselesaikan dengan menggunakan teori-teori dan metode yang sejalan dengan penelitian. Industri sudah sangat berkembang di Indonesia untuk memenuhi perekonomian yang salah satunya adalah industri semen sebagai penyokong keberlangsungan pembangunan secara merata. Pengemasan produk semen menjadi produk barang akhir merupakan tahapan paling akhir yang ada di aliran proses produksi pembuatan semen menggunakan mesin yang sangat berpengaruh terhadap pengiriman kepada pelanggan. Dalam prosesnya, ditemukan permasalahan yang dapat mempengaruhi waktu operasi mesin maka langkah selanjutnya yang dilakukan setelah mengidentifikasi akar penyebab permasalahan adalah menentukan rencana solusi yang ingin dilakukan serta menetapkan target yang ingin dicapai dalam periode tertentu. Kerangka metode yang digunakan sebagai implementasi dari landasan teori PDSA untuk merealisasikan rencana solusi dan target adalah menggunakan metode DMAIC.
Final project writing is made to conduct research on a problem that exists in the company and is solved using theories and methods that are in line with research. Industry has been very developed in Indonesia to meet the economy, one of which is the cement industry as a support for the sustainability of development equally. Packaging cement products into final goods products is the last stage in the flow of the cement manufacturing production process using machines that greatly affect delivery to customers. In the process, problems are found that can affect the engine operation time, so the next step taken after identifying the root cause of the problem is to determine the solution plan to be done and set targets to be achieved within a certain period. The framework of the method used as an implementation of the PDSA theoretical foundation to realize the solution plan and target is using the DMAIC method.
URI: http://repository.ipb.ac.id/handle/123456789/154674
Appears in Collections:UT - Industrial Management

Files in This Item:
File Description SizeFormat 
cover_J0311201066_435e1b6d739d48d1a3cc64a5119d0d0a.pdfCover492.67 kBAdobe PDFView/Open
fulltext_J0311201066_d1b3d78c0c4f47d0bd1fb76f6c09bb34.pdf
  Restricted Access
Fulltext1.09 MBAdobe PDFView/Open
lampiran_J0311201066_b8338243b43b48fb93da1806b848c85d.pdf
  Restricted Access
Lampiran588.43 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.