Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/154497
Title: Optimasi Penjadwalan Produksi dan Perencanaan Kebutuhan Material dalam Mengatasi Excess Stock di PT XYZ
Other Titles: The Optimization of Production Scheduling and Material Requipment Planning to Eliminate Excess Stock at PT XYZ
Authors: Dardanella, Derry
Ashila, Feyza
Issue Date: 2024
Publisher: IPB University
Abstract: PT XYZ merupakan perusahaan yang bergerak di bidang flexible packaging dengan merk jual Arlene dan Areta yang menerapkan strategi produksi make to order. Permasalahan yang timbul di perusahaan yaitu terdapatnya penumpukan excess stock atau barang jadi tidak bertuan pada gudang penyimpanan yang dapat mengakibatkan kerugian karena ada aset mengendap dan menaikkan biaya penyimpanan. Tujuan penelitian ini untuk mengungkapkan akar penyebab terjadinya penumpukan excess stock dan mencari solusi yang tepat dalam mengatasinya. Proses identifikasi masalah untuk menemukan sebab potensial menggunakan fishbone analysis, didapati hasil adanya penyimpangan dalam penggunaan bahan baku karena belum adanya sistem perhitungan secara matematis dan konkret dan tidak terlibatnya excess stock sebagai on hand inventory saat melakukan penjadwalan produksi, yang membuat penyusutan nilai excess stock rendah. Metode yang digunakan adalah master production schedule atau jadwal induk produksi yang membutuhkan input dari forecasting atau peramalan permintaan dan perencanaan agregat, serta menggunakan material requipment planning yang diharapkan dapat membantu perusahaan dalam mengeliminasi excess stock.
PT XYZ is a company engaged in flexible packaging with Arlene and Areta selling brands that implement a make-to-order production strategy. The problem that arises in the company is the accumulation of excess stock or finished goods in the storage warehouse which can result in losses because there are assets settling and increasing storage costs. The purpose of this research is to reveal the root cause of the excess stock and find the right solution to solve it. The process of identifying problems to find potential causes using fishbone analysis, found the results of irregularities in the use of raw materials due to the absence of a mathematical and concrete calculation system and the exclusion of excess stock as on hand inventory when scheduling production, which makes the depreciation value of excess stock low. The method used is a master production schedule that requires input from forecasting and aggregate planning, and uses material requipment planning which is expected to help the company eliminate excess stock.
URI: http://repository.ipb.ac.id/handle/123456789/154497
Appears in Collections:UT - Industrial Management

Files in This Item:
File Description SizeFormat 
cover_J0311201164_edd0f3cf34fd4dada787cb87495595cd.pdfCover740.71 kBAdobe PDFView/Open
fulltext_J0311201164_dc62f56784724e5db114dbdf851c2ffe.pdf
  Restricted Access
Fulltext2.21 MBAdobe PDFView/Open
lampiran_J0311201164_565b955a23a94b498f40c84b89c85159.pdf
  Restricted Access
Lampiran1.23 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.