Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/154355
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorYusri, Doni-
dc.contributor.authorPermatasari, Risma Ayu-
dc.date.accessioned2024-07-19T08:53:57Z-
dc.date.available2024-07-19T08:53:57Z-
dc.date.issued2024-
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/154355-
dc.description.abstractPenelitian ini bertujuan untuk mengkaji dan menganalisis permasalahan penting dan mendesak yaitu keterlambatan dalam penyelesaian proses produksi kendaraan di PT XYZ. Berdasarkan perbandingan antara waktu perencanaan dan realisasi produksi, ditemukan bahwa proses pembuatan cover jok adalah komponen yang paling mengalami keterlambatan dibandingkan dengan rencana awal. Sebagai upaya mengatasi masalah tersebut, penelitian ini mengusulkan dua solusi pokok yaitu pernghitungan waktu baku proses pembuatan cover jok menggunakan metode work sampling dan perancangan Standar Operasional Prosedur (SOP) di departemen produksi cover jok untuk mengoptimalkan alur proses serta meningkatkan efisiensi. Hasil perhitungan waktu baku pada bagian cover jok mendapatkan hasil 115,7 menit per pcs. Usulan waktu baku pada bagian cover jok diharapkan dapat menjadi acuan bagian departemen terakit untuk melakukan estimasi jadwal produksi dan sumber daya yang dibutuhkan.-
dc.description.abstractThis study aims to examine and analyze important and urgent problems, namely delays in the completion of the vehicle production process at PT XYZ. Based on the comparison between planning time and production realization, it was found that the seat cover manufacturing process was the component that experienced the most delays compared to the initial plan. In an effort to overcome this problem, this study proposes two main solutions, namely the calculation of the standard time of the seat cover manufacturing process using the work sampling method and the design of Standard Operating Procedures (SOP) in the seat cover production department to optimize the process flow and improve efficiency. The results of the calculation of standard time in the seat cover section resulted in 115.7 minutes per pcs. The proposed standard time in the seat cover section is expected to be a reference for the assembled department to estimate the production schedule and resources needed.-
dc.description.sponsorshipnull-
dc.language.isoid-
dc.publisherIPB Universityid
dc.titlePerancangan Standar Operasional Prosedur dan Perhitungan Waktu Baku pada Bagian Cover Jok Medium Bus di PT XYZid
dc.title.alternativeDesign of Standard Operating Procedures and Standard Time in the Medium Bus Seat Cover Section at PT XYZ-
dc.typeTugas Akhir-
dc.subject.keywordWaktu Bakuid
dc.subject.keywordPengukuran Kerjaid
dc.subject.keywordStandard Timeid
dc.subject.keywordStandar Operasional Prosedur (SOP)id
dc.subject.keywordwork samplingid
dc.subject.keywordWork Measurementid
Appears in Collections:UT - Industrial Management

Files in This Item:
File Description SizeFormat 
cover_J0311202188_b6341218e9224078b8a8947ab1a4e34f.pdfCover3.27 MBAdobe PDFView/Open
fulltext_J0311202188_e736fe60a14b4269b6707cba977997ce.pdf
  Restricted Access
Fulltext3.75 MBAdobe PDFView/Open
lampiran_J0311202188_e2134064b287435bac8d5fb020a1bf27.pdf
  Restricted Access
Lampiran3.03 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.