Title: Analisis Penerapan Perencanaan Produksi pada Produk Hollow 4x4 dengan Panjang 2,7 Meter di PT XYZ
Other Titles: The Implementation of Production Planning on Hollow 4x4 with a Length of 2,7 Meters at PT XYZ
Authors: Darmawan, Muhammad Arif
MAYSYAVIANDA, ARNETA
Issue Date: 2024
Publisher: IPB University
Abstract: PT XYZ adalah perusahaan ternama dalam industri bahan bangunan di Indonesia. Salah satu produk unggulannya adalah Hollow 4 x 4 berukuran 2,7 meter. Namun, perusahaan menghadapi tantangan dalam perencanaan produksi, terutama terkait ketidaksesuaian jadwal produksi dengan rencana awal dari departemen PPIC. Untuk mengatasi masalah ini, penelitian dilakukan dengan menggunakan metode peramalan dengan data triwulan dan perencanaan agregat, serta pembuatan jadwal induk produksi. Hasil peramalan terbaik menggunakan metode Multiplicative Decomposition dengan total prakiraan sebanyak 1.727 batang. Strategi perencanaan agregat yang dipilih adalah Mix Strategy 1 dengan biaya Rp132.452.825,-. Strategi tersebut akan digunakan untuk perhitungan Jadwal Induk Produksi. Jadwal Induk Produksi dihitung menggunakan ketetapan perusahaan atau Order Policy yang menghasilkan dua Jadwal Induk Produksi berdasarkan permintaan perusahaan untuk menentukan jadwal yang paling sesuai.
PT XYZ is a renowned company in the building materials industry in Indonesia. One of its flagship products is the 2.7-meter-long Hollow 4 x 4. However, the company faces challenges in production planning, particularly regarding the misalignment of production schedules with the initial plans from the PPIC department. To address this issue, research is conducted using forecasting methods with quarterly data and aggregate planning, as well as creating a master production schedule. The best forecasting result is achieved using the Multiplicative Decomposition method, with a total forecast 1,727 units. The selected aggregate planning strategy is Mix Strategy 1, with a cost Rp132,452,825. This strategy will be used for the master production schedule calculation. The master production schedule is calculated based on the company
URI: http://repository.ipb.ac.id/handle/123456789/153980
Appears in Collections:UT - Industrial Management

Files in This Item:
File Description SizeFormat 
cover_J0311201006_48fb2cefa3b84215a9218a9cb4438842.pdfCover2.41 MBAdobe PDFView/Open
fulltext_J0311201006_15e77e4733ef47ef9a7d7e2d56c2e637.pdf
  Restricted Access
Fulltext3.06 MBAdobe PDFView/Open
lampiran_J0311201006_b245921cd4044b66b72277f3a67559e5.pdf
  Restricted Access
Lampiran2.73 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.