Please use this identifier to cite or link to this item:
http://repository.ipb.ac.id/handle/123456789/152800Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.advisor | Budiaman, Ahmad | - |
| dc.contributor.author | Qonitatun, Aulia | - |
| dc.date.accessioned | 2024-06-13T06:04:41Z | - |
| dc.date.available | 2024-06-13T06:04:41Z | - |
| dc.date.issued | 2024-06-12 | - |
| dc.identifier.uri | http://repository.ipb.ac.id/handle/123456789/152800 | - |
| dc.description.abstract | Biaya operasi penyaradan merupakan faktor penting pada pemanenan hutan dengan kondisi topografi yang sulit dan curam. Derek yang terpasang pada hardtop dapat digunakan sebagai alat untuk memindahkan kayu dari tunggak ke TPn. Tujuan penelitian adalah menghitung biaya dan produktivitas penyaradan kayu dengan menggunakan derek yang dipasang pada hardtop bekas. Penentuan produktivitas melalui volume dan waktu kerja yang dihasilkan tiap siklusnya. Sementara data biaya didapatkan dari hasil wawancara dengan operator sarad untuk menentukan biaya tetap dan biaya variabel. Produktivitas rata-rata penyaradan tiap setting adalah 10,39 m3/jam dengan volume dan waktu kerja ratarata per siklus sebesar 16,84 m3 dan 1,69 jam. Adapun rata-rata jarak sarad yang ditempuh sebesar 56 m. Biaya rata-rata penyaradan sebesar Rp 9.145,21 /m3. Besarnya hasil produktivitas dan biaya penyaradan dipengaruhi oleh volume kayu yang disarad, jarak sarad, dan waktu kerja penyaradan. Di samping itu, pemilihan alat sarad yang tepat menjadi faktor penting dalam kegiatan penyaradan agar hasil yang diperoleh lebih efektif dan efisien. | id |
| dc.description.abstract | The cost of forest harvesting operations is essential in forested areas with difficult and steep topographic conditions. A winch attached to a hardtop can be used as an effective tool to move wood from arrears to TPn. The study aimed to calculate the cost and productivity of wood skidding using a crane mounted on a used hardtop. Determination of productivity through the volume and time of work produced each cycle. Meanwhile, costs are obtained from operator interview results to determine fixed and variable costs. The average productivity of skidding all trees is 10,39 m3 / hour with average volume and working time of 16,84 m3 and 1,69 hours. The average distance travelled is 56 m. The average cost of skidding is Rp 9.145,21/m3. The amount of productivity yield and skidding cost is influenced by the volume of wood being slipped, the distance of the skidding, and the skidding work time. In addition, selecting the right sarad tool is an essential factor in skidding activities to make the results more effective and efficient. | id |
| dc.language.iso | id | id |
| dc.publisher | IPB University | id |
| dc.title | Biaya dan Produktivitas Teknik Penyaradan Kayu Menggunakan Derek yang Terpasang pada Hardtop Bekas di KPH Ciamis | id |
| dc.title.alternative | Cost and Productivity of Wood Skidding Techniques Using Mounted Winch on Used Hardtop in KPH Ciamis | id |
| dc.type | Undergraduate Thesis | id |
| dc.subject.keyword | Biaya | id |
| dc.subject.keyword | Derek | id |
| dc.subject.keyword | Penyaradan | id |
| dc.subject.keyword | Produktivitas | id |
| Appears in Collections: | UT - Forest Management | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Cover.pdf Restricted Access | Cover | 917 kB | Adobe PDF | View/Open |
| Full teks.pdf Restricted Access | Full teks | 1.24 MB | Adobe PDF | View/Open |
| Lampiran.pdf Restricted Access | Lampiran | 221.67 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.