Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/122066
Title: Perancangan Sistem Pemanenan Air Hujan untuk Pengisian Reservoir di Laboratorium Terpadu SIL
Other Titles: Design of a Rainwater Harvesting System to Fill the Reservoir in the SIL Integrated Laboratory, Dramaga Campus of IPB
Authors: Setiawan, Budi Indra
Fathoni, Ihsanul Gilang
Issue Date: 2023
Publisher: IPB University
Abstract: Pemanenan air hujan merupakan salah satu cara memanfaatkan air hujan dengan cara menampung air hujan dan digunakan untuk berbagai keperluan. Penelitian ini bertujuan membuat rancangan sistem pemanenan air hujan yang bisa digunakan untuk mengisi reservoir yang telah tersedia. Penelitian dilakukan di Laboratorium Terpadu SIL, Kampus IPB Dramaga. Data yang dibutuhkan berupa data luasan atap, volume reservoir eksisting, dan data curah hujan 10 tahun terakhir. Volume curah hujan yang dapat dipanen terbesar yaitu 175,69 m3/bulan dan volume paling kecil sebesar 36,83 m3/bulan. Talang air eksisting berbentuk persegi dengan panjang 40 meter dan lebar 0.3 meter. Pipa tegak galvanis dengan diameter 5 inci yang berjumlah 6 buah. Bak kontrol yang digunakan berukuran 160,5 cm x 90 cm x 100 cm dan terhubung dengan reservoir dengan pipa ukuran 4 inci. Reservoir eksisting berjumlah 2 unit dan ukuran reservoir eksisting yaitu 5,85 meter x 1,3 meter x 1,5 meter dengan volume tampungan 22,83 m3. Sumur resapan akan dibuat dengan diameter 1 m dan kedalaman 2 m dan berjumlah 1 unit. Air hujan yang dipanen dan dikumpulkan dimanfaatkan untuk kebutuhan air kolam pembesaran ikan
Rainwater harvesting is one way to use rainwater by collecting rainwater and using it for various purposes. This study aims to design a rainwater harvesting system that can be used to fill an existing reservoir. The research was conducted at the SIL Integrated Laboratory, Dramaga Campus of IPB. The required data is in the form of roof area, the volume of the existing reservoir, and the form of rainfall data for the last 10 years. The largest volume of rainfall that can be harvested is 175.69 m3/month and the smallest volume is 36.83 m3/month. The existing gutters are square in shape with a length of 40 meters and a width of 0.3 meters. Vertical galvanized pipes with a diameter of 5 inches, totaling 6 pieces. The control tub was 160,5 cm x 90 cm x 100 cm and connected to a reservoir with a 4-inch pipe. There are 2 existing reservoirs and the size of the existing reservoir is 5.85 meters x 1.3 meters x 1.5 meters with a storage volume of 22.83 m3. Infiltration wells will be made with a diameter of 1 m, a depth of 2 m, and a total of 1 unit. Rainwater that is harvested and collected is used for the water needs of fish-rearing ponds
URI: http://repository.ipb.ac.id/handle/123456789/122066
Appears in Collections:UT - Civil and Environmental Engineering

Files in This Item:
File Description SizeFormat 
Cover,lembar pernyataan,Abstrak, Lembar Pengesahan,Prakata dan Daftar isi.pdf
  Restricted Access
Cover2.34 MBAdobe PDFView/Open
F44190075_Ihsanul Gilang Fathoni.pdf
  Restricted Access
Fullteks3.23 MBAdobe PDFView/Open
Lampiran.pdf
  Restricted Access
Lampiran2.36 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.