Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/112910
Title: Produktivitas dan Biaya Penebangan serta Pembagian Batang Kayu Jati di BKPH Brumbun KPH Madiun
Authors: Matangaran, Juang Rata
Noerbayti
Issue Date: 2022
Publisher: IPB University
Abstract: Jati menjadi bahan baku industri perkayuan yang memiliki kualitas dan nilai jual tinggi, Perum Perhutani sebagai pemasok kayu jati di Indonesia. Untuk memenuhi bahan baku industri diperlukan tahapan kegiatan pemanenan meliputi kegiatan penebangan, penyaradan, muat bongkar, pengangkutan. Penelitian ini bertujuan menganalisis produktivitas, waktu kerja, biaya kegiatan penebangan dan pembagian batang, menganalisis hubungan antara diameter dengan waktu kerja. Penelitian dilaksanakan dengan mengamati waktu kerja penebangan dan pembagian batang, mengukur diameter (cm), panjang (m) pohon, menghitung produktivitas serta menghitung analisis biaya. Produktivitas rata-rata penebangan dan pembagian batang sebesar 2,86 m3 /jam dengan total biaya yang dikeluarkan berdasarkan analisis biaya yang dihitung jika Perum Perhutani memiliki alat sendiri sebesar Rp 22.152,33/m3 . Produktivitas kerja dapat ditingkatkan dengan cara pelatihan bagi operator chainsaw.
Teak is raw materials in the timber industry which has a high quality and high selling point, Perum Perhutani as a supplier of teak in Indonesia. To meet the needs of industry requires a harvesting phase like felling, skidding, loading unloading, transportation. The study aimed to analysis productivity, time study, the cost of felling and bucking activities, analyzing the correlation between diameter and time of work. The study was conducted the time of the logging work and the division of the timber, measured in diameter (cm), length (m) tree, counting productivity and then calculate cost analysis. The average productivity of felling and bucking is 2,86 m3 /hour with the amount of charges Perum Perhutani issued based on the cost analysis that was calculated if Perum Perhutani had his own tools is Rp 22.152,33/m3 . Productivity can be improved by training chainsaw operator.
URI: http://repository.ipb.ac.id/handle/123456789/112910
Appears in Collections:UT - Forest Management

Files in This Item:
File Description SizeFormat 
cover.pdf
  Restricted Access
Cover356.4 kBAdobe PDFView/Open
E14180049_Noerbayti.pdf
  Restricted Access
Fulltext610.12 kBAdobe PDFView/Open
lampiran.pdf
  Restricted Access
Lampiran328.5 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.