Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/111661
Title: Analisis Struktur Kelembagaan Dan Biaya Transaksi Program Green Campus Periode 2018-2020 Di IPB University
Other Titles: Analysis of Institutional Structure and Transaction Costs for the 2018-2020 Green Campus Program at IPB University
Authors: Gandhi, Prima
Hidayat, Aceng
Laristiyani, Silmi Bulgis
Issue Date: 22-Apr-2022
Publisher: IPB University
Abstract: Green campus IPB University mengalami penurunan peringkat setiap tahunnya pada UI GreenMetric Ranking, hal tersebut yang melatarbelakangi penelitian ini. Pada penelitian kali ini menggunakan analisis data yakni Microsoft excel dan Statistikal Package for the Social Sciens (SPSS). Stakeholder yang terlibat dengan pengelolaan green campus di IPB University merupakan 1). Subjects yakni Asisten Direktur Pengelolaan Transportasi dan Pengamanan Lingkungan Kampus dan Asisten Direktur Pengelolaan Bangunan dan Instalasi. 2). Players yakni Rektor, Wakil Rektor 2, SI dan Direktur DPSPLK. 3). Bystanders yakni Supervisor Instalasi Air, Supervisor Limbah, Supervisor Perizinan Lingkungan. 4). Actors yakni BEM KM IPB University. Total biaya transaksi yang dikeluarkan oleh IPB University dalam program green campus dalam kurun waktu 2018-2020 adalah Rp 23.783.836.091. Biaya yang dikeluarkan merupakan biaya monitoring atau pemeliharaan, biaya edukasi dan sosialisasi, biaya internalisasi, biaya pencarian informasi, biaya pembuatan peraturan atau kebijakan, dan biaya pemberlakuan sanksi.
The green campus ranking of IPB University has decreased every year on the UI GreenMetric Ranking, which is the background of this research. This uses data analysis, namely Microsoft Excel and the Statistical Package for the Social Sciences (SPSS). The stakeholders involved in managing the green campus at IPB University are 1). Subjects are Assistant Director of Transportation Management and Campus Environmental Security and Assistant Director of Building and Installation Management. 2). Players are the Chancellor, Deputy Chancellor 2, SI, and the Director of DPSPLK. 3). Bystanders, namely Water Installation Supervisor, Waste Supervisor, and Environmental Licensing Supervisor. 4). Actors name, ly BEM KM IPB University. The total transaction fee issued by IPB University in the green campus program in the 2018-2020 period is Rp. 23,783,836,091. The costs incurred are monitoring or maintenance costs, education and socialization and internalization information-seeking costs, regulatory or pol policy-makings, and the sanction imposed costs.
URI: http://repository.ipb.ac.id/handle/123456789/111661
Appears in Collections:UT - Resources and Environmental Economic

Files in This Item:
File Description SizeFormat 
Cover.pdf
  Restricted Access
Cover636.12 kBAdobe PDFView/Open
Skripsi Silmi Bulgis Laristiyani (H44170042).pdf
  Restricted Access
Fullteks1.33 MBAdobe PDFView/Open
Lampiran.pdf
  Restricted Access
Lampiran456.45 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.