Penjadwalan Proyek Menggunakan Metode Aljabar Max-Plus: Studi Kasus pada Pemasangan Pengolah Air PDAM Kota Semarang.
View/ Open
Date
2015Author
Noor, Arpi Median Lavandi
Ilyas, Muhammad
Siswandi
Metadata
Show full item recordAbstract
Project scheduling is part of the project management which planning the implementation of activities in a project in a structured manner and have a clear time limitation. The linkage among activities in a project can be transformed into the form of matrix which can be analyzed by using max-plus algebraic method. This matrix will then be applied in the calculation to obtain the required solution of the project scheduling, such as the optimum time, critical path, and a time tolerance.
Collections
- UT - Mathematics [1433]