View Item 
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Faculty of Economics and Management
      • UT - Agribusiness
      • View Item
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Faculty of Economics and Management
      • UT - Agribusiness
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Manajemen Persediaan Bahan Baku Singkong (Studi Kasus UMKM XYZ)

      Thumbnail
      View/Open
      Cover (206.5Kb)
      Fulltext (858.9Kb)
      Lampiran (322.7Kb)
      Date
      2024
      Author
      Puspitasari, Shyvania Agatha
      Rachmina, Dwi
      Aviny, Eva Yolynda
      Metadata
      Show full item record
      Abstract
      Ketersediaan bahan baku yang tepat dan sesuai akan meningkatkan kinerja perusahaan dalam memenuhi permintaan konsumen. Salah satu UMKM yang memproduksi keripik singkong berada di Desa Cijujung, Kabupaten Bogor. UMKM XYZ mengalami kesulitan pasokan bahan baku singkong sehingga tidak dapat memenuhi kebutuhan bahan baku. Tujuan dari penelitian ini yaitu untuk menalisis m anajemen persediaan bahan baku pada UMKM XYZ menggunakan metode Material Requirement Planning (MRP). Proses pengolahan data diawali dengan melakukan peramalan menggunakan Single Exponential Smoothing dan selanjutnya menggunakan teknik Lot sizing yaitu Lot for Lot (LFL). Hasil peramalan menunjukkan dari November 2023 ke Desember 2023 menurun sebanyak -0,5%. Hasil analisis menunjukkan total biaya pendekatan Lot for Lot dalam MRP lebih rendah 98% dibanding biaya pengelolaan persediaan bahan baku yang selama ini diterapkan perusahaan. Penerapan metode Lot For Lot dinilai tepat untuk UMKM XYZ, karena selain lebih hemat juga relatif mudah dan bersifat dinamis.
       
      The availability of appropriate raw materials will improve company performance in meeting consumer demand. One of the MSMEs that produces cassava chips is in Cijujung Village, Bogor Regency. XYZ MSMEs experienced difficulties in supplying cassava raw materials so they were unable to meet their raw material needs. Therefore, the aim of this research is to analyze raw material inventory management at XYZ MSMEs using the Material Requirement Planning (MRP) method. The data processing process begins with forecasting using Single Exponential Smoothing and then using the Lot sizing technique, namely Lot for Lot (LFL). The forecasting results show a decrease of -0.5% from November 2023 to December 2023. The analysis results show that the total cost of the Lot for Lot approach in MRP is 98% lower compared to the inventory management costs previously applied by the company. The implementation of the Lot for Lot method is considered suitable for XYZ MSMEs, as it is not only more cost-effective but also relatively easy and dynamic.
       
      URI
      http://repository.ipb.ac.id/handle/123456789/158414
      Collections
      • UT - Agribusiness [4776]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository