View Item 
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Faculty of Forestry and Environment
      • UT - Forest Management
      • View Item
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Faculty of Forestry and Environment
      • UT - Forest Management
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Produktivitas dan Analisis Biaya Penebangan Kayu di IUPHHK-HT PT. Wirakarya Sakti

      Thumbnail
      View/Open
      Cover (2.692Mb)
      Fullteks (5.819Mb)
      Lampiran (1.423Mb)
      Date
      2022-01-07
      Author
      Parawansa, Nadia Musyafiqa
      Matangaran, Juang Rata
      Metadata
      Show full item record
      Abstract
      Penebangan pohon merupakan langkah awal dari kegiatan pemanenan kayu dengan salah satu tujuannya yaitu untuk memperoleh bahan baku bagi industri perkayuan. Penelitian ini bertujuan untuk menganalisis produktivitas dan biaya penebangan melalui pengukuran waktu, prestasi kerja, dan komponen biaya peralatan tebang.di IUPHHK-HT PT. Wirakarya Sakti. Hasil produktivitas penebangan rata-rata sebesar 9,17 m3/jam dengan rata-rata waktu aktual 0,01 jam dan volume rata-rata 0,11 m3. Biaya penebangan diperoleh sebesar Rp 4.138/m3. Produktivitas kerja dapat ditingkatkan dengan cara meminimalisir penundaan waktu kerja dan meningkatkan keterampilan operator, sehingga biaya yang dikeluarkan lebih sedikit.
       
      Felling is the first step in timber harvesting activities, with one of the goals being to obtain raw materials for the timber industry. This study aimed to analyze the productivity and cost of felling through the measurement of time, work performance, and components of cost of felling equipment in IUPHHK-HT PT. Wirakarya Sakti. The average result of felling productivity is 9.17 m3/hour with average actual time is about 0.01 hours and average volume about 0.11 m3. The cost of felling is Rp 4 138/m3. Productivity can be improved by minimizing work time delays and improving operators skills, resulting in lower costs.
       
      URI
      http://repository.ipb.ac.id/handle/123456789/110521
      Collections
      • UT - Forest Management [3207]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository