Show simple item record

dc.contributor.authorKarim, Said
dc.contributor.authorKarim, Nora H.
dc.contributor.authorSapei, Asep
dc.date.accessioned2015-09-11T03:11:11Z
dc.date.available2015-09-11T03:11:11Z
dc.date.issued2014-12
dc.identifier.issn2087-3611
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/76263
dc.description.abstractDaerah Aliran Sungai (DAS) Citanduy adalah salah satu dari enam DAS kritis dan prioritas penanganan yang terdapat di Provinsi Jawa Barat. Sub-DAS Citanduy Hulu dengan luas 270.918,26 ha terdapat permasalahan sedimen dan penurunan kualitas air yang semakin hari semakin meningkat, sehingga memicu permasalahan lain seperti banjir, kekeringan dan kekurangan air baku serta permasalahan kesehatan penduduk sekitar yang memanfaatkan aliran air Sungai Citanduy. Studi ini menerapkan Model Soil and Water Assessment Tool (SWAT) dengan menggunakan data historis aliran dan meteoroli untuk mengevaluasi kondisi sedimentasi Sub-DAS Citanduy Hulu sekaligus menyusun strategi pengendalian sedimen dengan menggunakan bangunan pengendali sedimen. Kalibrasi model dilakukan secara manual dengan metode coba-coba. Hasil kalibrasi menunjukkan 13 parameter yang sensitif terhadap debit aliran dan sedimen. Berdasarkan hasil perhitungan model SWAT diperkirakan volume sedimen di outlet Sub-DAS Citanduy Hulu sebesar 81.351.783,23 ton/tahun. Sedimen di outlet Sub-DAS Citanduy Hulu ini dapat direduksi hingga mencapai 29.557.556 ton/tahun atau menurun lebih dari 64% dengan menggunakan check dam sebagai bangunan pengendali sedimen.en
dc.description.abstractCitanduy Watershed is one of the six Watershed critical and handling priority located in the West Java Province. Upper Citanduy Sub- Watershed area of 270.918,26 ha there are sedimentation and degradation of water quality are major problems in Upper Citanduy Watershed (UCW). So that triggered other problems such as flood, drougt, raw water shortage and public health problems nearby residents who benefit from the Citanduy river. The SWAT model using historical flow and meteorological data was applied here to evaluate sediment yield and to get alternative strategies for sediment control in Upper Citanduy Sub- Watershed using a sediment control structures. The model Calibration process manually using trial-error method. Based on manual calibration, 13 parameters were identified sensitive to water discharge and sediment. The model simulation showed that sediment yield in the outlet Upper Citanduy Sub-Watershed was 81,351,783.23 tons per year, Sediment at Upper Citanduy Sub-Watershed could be reduced to 29,557,556 tons per year or reduced more than 64% using check dam as a sediment control structures.en
dc.language.isoid
dc.publisherPusat Penelitian dan Pengembangan Sumber Daya Air, Badan Penelitian dan Pengembangan, Kementerian Pekerjaan Umum
dc.subject.ddcKualitas airen
dc.subject.ddcsedimentasien
dc.subject.ddckontrol sedimenen
dc.subject.ddcmodel SWATen
dc.subject.ddcSub-DAS Citanduy Huluen
dc.titleANALISIS BANGUNAN PENGENDALI SEDIMEN DENGAN MENGGUNAKAN MODEL SOIL AND WATER ASSESSMENT TOOL PADA SUB-DAERAH ALlRAN SUNGAI CITANDUY HULU, JAWA BARATen
dc.title.alternativeSEDIMENT CONTROL STRUCTURES ANALYSIS USING SOIL AND WATER ASSESSMENT TOOL MODEL IN UPPER CITANDUY SUB-WATERSHED, WESTJAVAen
dc.typeArticleen


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record