View Item 
      •   IPB Repository
      • IPBana
      • Articles
      • Faculty of Mathematics and Natural Sciences
      • Computer Science
      • View Item
      •   IPB Repository
      • IPBana
      • Articles
      • Faculty of Mathematics and Natural Sciences
      • Computer Science
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      RANCANG BANGUN SISTEM INFORMASI MANAJEMEN KEPEGAWAIAN DENGAN METODE THE OPEN GROUP ARCHITECTURE FRAMEWORK (TOGAF)

      Thumbnail
      View/Open
      JIPI 2011.MTR pdf.pdf (5.442Mb)
      Date
      2014-10-09
      Author
      Rachmaniah, Meuthia
      Adriantol, Hari Agung
      Aziz, Abdul
      Metadata
      Show full item record
      Abstract
      The personnel administration process for functional staff follow bureaucratic procedures that is time consuming and often difficult to monitor. Further, the process will be prolonged if the process is handled manually. These conditions are often limit staff managers at unit level, technical implementation unit (UPT), or functional staff who need the information timely in a precise and accurate format. Manual handling cannot support the information speed, because staffs have to manually track file{s) or documents in the chain of bureaucracy th at is complex and tedious. Delays in the process of obtaining such information could lead to adverse consequences in financial terms if for instance the termination in functional status and monthly salary occurred. One solution to this problem is to develop an online personnel information system (SIMPEG) to accelerate personnel information services. The Design of the online Sn.IJPEGdevelopment utilized the method of open group architecture framework (TOGAF) while the system development implemented prototype method. Further the prototype is tested using developed questionnaires. In general the results of this study contribute to personnel information service acceleration. The promotions process (KP) was accelerated to 66.67% i.e. from 11-12 months to 4-3 months. Personnel time off and personnel reinstated (ABK) also accelerated by 66.67% that is previously taken 5-6 months to 2 months. White the process of scholarship approval was accelerated by 50% compared to the old system which was 3-4 months to 2 months.
      URI
      http://repository.ipb.ac.id/handle/123456789/69840
      Collections
      • Computer Science [72]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository