Show simple item record

dc.contributor.advisorRusli, Meika Syahbana
dc.contributor.advisorBantacut, Tajuddin
dc.contributor.authorThoriq, Ahmad Rifki
dc.date.accessioned2025-08-29T04:57:36Z
dc.date.available2025-08-29T04:57:36Z
dc.date.issued2025
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/170948
dc.description.abstractSentra Penggilingan Padi (SPP) BULOG Magetan mengalami kendala berupa akumulasi limbah abu sekam padi di lingkungan pabrik. Limbah tersebut mengandung silika (SiO2) dalam kadar tinggi, sehingga berpotensi dimanfaatkan sebagai bahan dasar pembuatan silika bubuk. Berdasarkan hasil eksplorasi, diketahui bahwa pabrik menghasilkan sekitar 1.000 kg abu sekam per hari, yang selama ini belum dimanfaatkan secara optimal. ASP mengandung silika sebesar 50,97%, yang berpotensi diekstraksi sebagai bahan baku industri. Oleh karena itu, dilakukan perancangan pabrik dengan pendekatan Systematic Layout Planning (SLP) berdasarkan analisis data P-Q-R-S-T, Activity Relationship Chart (ARC), dan Total Closeness Rating (TCR). Proses perancangan dibantu dengan algoritma BLOCPLAN untuk menghasilkan 20 alternatif layout. Alternatif terbaik dipilih berdasarkan nilai R-score tertinggi dan divisualisasikan dalam bentuk 2D dan 3D menggunakan SketchUp. Hasil perancangan menunjukkan bahwa pabrik silika dengan kapasitas produksi ±1.536 kg/batch per hari dapat direalisasikan secara efisien dengan pemanfaatan ruang seluas ±331 m².
dc.description.abstractThe Rice Milling Center (SPP) of BULOG Magetan is facing an issue of accumulated rice husk ash (RHA) waste within its facility. This waste contains a high concentration of silica (SiO2), making it a promising raw material for silica powder production. Based on exploratory findings, the plant generates approximately 1,000 kg of RHA daily, which has not been optimally utilized. With a silica content of 50.97%, RHA holds significant potential for industrial applications through extraction processes. To address this, a factory layout was designed using the Systematic Layout Planning (SLP) approach, incorporating analysis of P-Q-R-S-T data, an Activity Relationship Chart (ARC), and Total Closeness Rating (TCR). The layout development was supported by the BLOCPLAN algorithm, which generated 20 layout alternatives. The best alternative was selected based on the highest R-score and further visualized in both 2D and 3D using SketchUp. The results indicate that a silica powder plant with a production capacity of approximately 1,536 kg per batch per day can be efficiently implemented within a space of around 331 m².
dc.description.sponsorship
dc.language.isoid
dc.publisherIPB Universityid
dc.titlePerancangan Tata Letak Peralatan dan Mesin Estraksi Silika dari Limbah Abu Sekam Padi di SPP Bulog Magetanid
dc.title.alternativeDesign of Equipment and Machinery Layout for Silica Extraction from Rice Husk Ash Waste at SPP Bulog Magetan.
dc.typeSkripsi
dc.subject.keywordabu sekam padiid
dc.subject.keywordsilika bubukid
dc.subject.keywordsystematic layout planningid
dc.subject.keywordekstraksi limbahid
dc.subject.keywordalgoritma blocplanid


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record