View Item 
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Vocational School
      • UT - Supervisor of Food Quality Assurance
      • View Item
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Vocational School
      • UT - Supervisor of Food Quality Assurance
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Analisis Bottleneck pada Proses Produksi Nugget di PT XYZ

      Thumbnail
      View/Open
      Cover (2.517Mb)
      Fulltext (2.793Mb)
      Lampiran (2.018Mb)
      Date
      2025
      Author
      Rahman, Rafly Aulia
      Widodo, Slamet
      Metadata
      Show full item record
      Abstract
      Industri makanan olahan seperti nugget memiliki permintaan tinggi sehingga memerlukan proses produksi yang efisien. PT XYZ menghadapi masalah lembur akibat adanya bottleneck pada lini produksi. Penelitian ini bertujuan mengidentifikasi proses yang menjadi, menganalisis penyebabnya, dan memberikan rekomendasi perbaikan. Metode yang digunakan meliputi Value Stream Mapping (VSM), Process Activity Mapping (PAM), fishbone diagram, dan 5 Whys. Hasil penelitian menunjukkan bahwa bottleneck terjadi pada proses pengukusan dan pemotongan karena kapasitas mesin terbatas, metode kerja kurang efisien, serta jumlah tenaga kerja yang minim. Rekomendasi perbaikan meliputi penambahan tenaga kerja, pengaturan shift, penggunaan troli, dan pemeliharaan mesin. Implementasi perbaikan menurunkan cycle time dari 8 jam 51 menit menjadi 7 jam 54 menit, menghilangkan lembur, dan meningkatkan efisiensi proses dari 94,25% menjadi 96,62%.
       
      The processed food industry, such as nuggets, has high demand, requiring efficient production processes. PT XYZ faces overtime issues due to bottlenecks in its production line. This study aims to identify the bottleneck process, analyze its causes, and provide improvement recommendations. The methods used include Value Stream Mapping (VSM), Process Activity Mapping (PAM), fishbone diagram, and 5 Whys. The results showed that bottlenecks occurred in steaming and cutting processes due to limited machine capacity, inefficient work methods, and lack of manpower. Recommendations include adding workers, adjusting shifts, using trolleys, and maintaining machines. The implementation reduced cycle time from 8 hours 51 minutes to 7 hours 54 minutes, eliminated overtime, and improved process efficiency.
       
      URI
      http://repository.ipb.ac.id/handle/123456789/169613
      Collections
      • UT - Supervisor of Food Quality Assurance [236]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository