View Item 
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Vocational School
      • UT - Industrial Management
      • View Item
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Vocational School
      • UT - Industrial Management
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Pengukuran Waktu Baku pada Proses Produksi Part Interior di PT XYZ

      Thumbnail
      View/Open
      Cover (537.3Kb)
      Fulltext (1.263Mb)
      Lampiran (808.4Kb)
      Date
      2025
      Author
      MAHARANI, KAYLA
      Indrawan, Purana
      Metadata
      Show full item record
      Abstract
      KAYLA MAHARANI. Pengukuran Waktu Baku pada Proses Produksi Part Interior di PT XYZ. Dibimbing oleh PURANA INDRAWAN. PT XYZ merupakan perusahaan yang bergerak di industri otomotif yang menghasilkan produk kendaraan yang sangat beragam, perusahaan ini bergerak dalam tiga bidang bisnis yaitu karoseri, fabrikasi, serta assembly. Berdasarkan hasil observasi dan wawancara penulis, terdapat permasalahan pada penetapan waktu kerja yang berbeda dengan waktu aktual yang menyebabkan terhentinya proses produksi pada bagian trimming karena terdapat keterlambatan komponen yang diproduksi oleh bagian interior mobil. Dengan adanya penelitian ini dilakukan perhitungan waktu baku dengan hasil perhitungan 10,5 menit yang dimana dapat dijadikan sebagai evaluated standard time dan dapat menerapkan continuous improvement dengan instruksi kerja sebagai output proyek akhir. Kata Kunci: Instruksi Kerja, Pengukuran Waktu Kerja, Standard Time, Stopwatch
       
      KAYLA MAHARANI. Measuring Standard Time for Interior Part Production Process at PT XYZ. Supervised by PURANA INDRAWAN. PT XYZ is a company engaged in the automotive industry that produces a wide variety of vehicle products. This company is engaged in three business areas, namely bodywork, fabrication, and assembly. Based on the results of the author's observations and interviews, there were problems in determining working hours that were different from the actual time, which caused the production process in the trimming section to stop because there was a delay in components produced by the car interior section. With this research, a standard time calculation was carried out with a calculation result of 10.5 minutes, which can be used as an evaluated standard time and implemented for continuous improvement with work instructions as the final project output. Keywords: Standard Time, Stopwatch, Work Instructions, Work Time Measurement
       
      URI
      http://repository.ipb.ac.id/handle/123456789/165884
      Collections
      • UT - Industrial Management [219]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository