| dc.contributor.advisor | Ratnawati, Beata | |
| dc.contributor.author | GINTING.S, KEYREN JOHANA | |
| dc.date.accessioned | 2025-07-22T07:46:53Z | |
| dc.date.available | 2025-07-22T07:46:53Z | |
| dc.date.issued | 2025 | |
| dc.identifier.uri | http://repository.ipb.ac.id/handle/123456789/165604 | |
| dc.description.abstract | PT Nusa Pusaka Kencana adalah perusahaan perkebunan kelapa sawit yang
memiliki fasilitas perkantoran dan laboratorium pengujian. Kegiatan tersebut
menghasilkan limbah cair domestik dan laboratorium yang belum memiliki sistem
pengolahan. Penelitian ini bertujuan untuk merancang desain IPAL dan menyusun rencana
anggaran biayanya. Metode yang digunakan meliputi analisis karakteristik air limbah,
penentuan debit rencana (7,87 m³/hari), pemilihan teknologi pengolahan melalui metode
skoring, perhitungan dimensi berdasarkan kriteria desain setiap unit pengolahan,
penggambaran DED dan penyusunan RAB. Unit yang dirancang terdiri dari bak netralisasi,
grease trap, ekualisasi, biofilter aerob, penampungan sementara, multi media filtrasi, dan
penampungan akhir. Hasil analisis menunjukkan beberapa parameter melebihi baku mutu,
seperti pH, BOD, COD, TSS, NH3-N, minyak dan lemak, Fe, dan Mn. IPAL dirancang
untuk menurunkan polutan hingga memenuhi baku mutu air PP No. 22 Tahun 2021 kelas
IV. Estimasi biaya pembangunan IPAL adalah Rp235.271.952. | |
| dc.description.sponsorship | PT Nusa Pusaka Kencana is a palm oil plantation company with office
facilities and a testing laboratory. These activities produce domestic and laboratory
wastewater that does not yet have a treatment system. This study aims to design a
wastewater treatment plant (WWTP) and prepare a budget plan. The methods used
include analyzing wastewater characteristics, determining the planned discharge
(7,87 m³/day), selecting treatment technology through a scoring method, calculating
dimensions based on the design criteria for each processing unit, drawing up a
Detailed Engineering Design (DED), and preparing a Budget Plan (RAB). The
designed unit consists of a neutralization tank, grease trap, equalization tank,
aerobic biofilter, temporary storage, multi-media filtration, and final storage. The
analysis results show that several parameters exceed the quality standards, such as
pH, BOD, COD, TSS, NH3-N, oil and fat, Fe, and Mn. The WWTP is designed to
reduce pollutants to meet the water quality standards of PP No. 22 of 2021 class IV.
The estimated cost of WWTP construction is Rp235.271.952. | |
| dc.language.iso | id | |
| dc.publisher | IPB University | id |
| dc.title | Perancangan Unit Instalasi Pengolahan Air Limbah Domestik dan Air Limbah Laboratorium PT Nusa Pusaka Kencana | id |
| dc.title.alternative | Design of Domestic Wastewater and Laboratory Wastewater Treatment Installation Unit of PT Nusa Pusaka Kencana | |
| dc.type | Tugas Akhir | |
| dc.subject.keyword | biofilter aerob | id |
| dc.subject.keyword | filtrasi | id |
| dc.subject.keyword | IPAL terintegrasi | id |
| dc.subject.keyword | teknologi tepat guna | id |
| dc.subject.keyword | aerobic biofilter | id |
| dc.subject.keyword | appropriate technology | id |
| dc.subject.keyword | filtration | id |
| dc.subject.keyword | integrated WWTP | id |