| dc.contributor.advisor | Indrawan, Purana | |
| dc.contributor.author | Rachman, Dzaitun Rachmiarty | |
| dc.date.accessioned | 2025-07-18T07:11:30Z | |
| dc.date.available | 2025-07-18T07:11:30Z | |
| dc.date.issued | 2025 | |
| dc.identifier.uri | http://repository.ipb.ac.id/handle/123456789/165296 | |
| dc.description.abstract | Proyek akhir ini dilatarbelakangi dengan adanya tingginya unplanned
downtime pada mesin mixing. Perawatan mesin perlu diperhatikan oleh perusahaan
karena dapat mempengaruhi produktivitas produksi dan efektivitas mesin. Dengan
melakukan perawatan rutin dan dokumentasi lebih terstruktur membuat perusahaan
dapat mendeteksi potensi masalah lebih dini, meminimalkan risiko kerusakan besar,
serta memastikan mesin beroperasi secara optimal. Pengetahuan operator dan rasa
kepemilikan operator yang masih minim terkait gejala kerusakan pada mesin juga
mempengaruhi gejala breakdown dan downtime mesin. Maka dibuatkanlah sebuah
check sheet perawatan mesin untuk membantu operator agar lebih rinci dalam segi
perawatan. Pada proyek akhir ini dibantu dengan menggunakan metode reliability
maintenance dan overall equipment eeffectiveness yang mana pada metode ini dibagi
menjadi dua periode yaitu periode sebelum penerapan check sheet dan setelah
penerapan checks heet. Sehingga pada dokumentasi hasil dapat terlihat perbandingan
hasil peningkatan atau penurunan dari dua periode tersebut. | |
| dc.description.abstract | This final project is motivated by the high unplanned downtime on the mixing
machine. Machine maintenance needs to be considered by companies because it can
affect production productivity and machine effectiveness. By doing routine
maintenance and more structured documentation, the company can detect potential
problems early, minimize the risk of major damage, and ensure the machine operates
optimally. The operator's lack of knowledge and ownership regarding the symptoms
of damage to the machine also affects the symptoms of machine breakdown and
downtime. So a machine maintenance check sheet was made to help operators to be
more detailed in terms of maintenance. In this final project, it is assisted by using the
reliability maintenance method and overall equipment eeffectiveness which in this
method is divided into two periods, namely the period before the application of the
check sheet and after the application of the checksheet. So that in the documentation
of the results can be seen a comparison of the results of the increase or decrease from
the two periods. | |
| dc.description.sponsorship | | |
| dc.language.iso | id | |
| dc.publisher | IPB University | id |
| dc.title | Penerapan Check Sheet Perawatan Mesin Mixing Produksi Tepung Bumbu Untuk Minimasi Unplanned Downtime Di CV XYZ | id |
| dc.title.alternative | | |
| dc.type | Tugas Akhir | |
| dc.subject.keyword | Check sheet | id |
| dc.subject.keyword | Machine maintenance | id |
| dc.subject.keyword | Total Productive Maintenance | id |
| dc.subject.keyword | production | id |