View Item 
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Vocational School
      • UT - Industrial Management
      • View Item
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Vocational School
      • UT - Industrial Management
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      ANALISIS PENGUKURAN WAKTU BAKU DENGAN METODE STOPWATCH PADA PEKERJAAN PERGANTIAN PISAU SLITTING DI PT XYZ

      No Thumbnail [100%x80]
      View/Open
      Cover (1.670Mb)
      Fulltext (2.104Mb)
      Lampiran (969.7Kb)
      Date
      2024
      Author
      Putri, Sri Ayu Aprilia
      Irawan, Suhendi
      Metadata
      Show full item record
      Abstract
      Pengukuran waktu kerja merupakan cara untuk menentukan lama pengerjaan yang diperlukan oleh pekerja dengan kemampuan normal. Pengoptimalan waktu kerja dalam melakukan pekerjaannya. Penghitungan waktu baku dengan metode stopwatch dilakukan di PT XYZ untuk menentukan waktu baku dan beban kerja di area slitting, yang belum terdapat waktu baku dalam pengerjaannya. Selain itu dalam proses pergantian pisau yang hanya dilakukan oleh satu pekerja membuat pekerja merasa bahwa terdapat beban kerja yang berlebihan. Dengan adanya penelitian ini dilakukan penghitungan waktu baku yang dimana dapat menjadi acuan untuk scheduler untuk menentukan target penyelesaian produksi. Hal ini juga menjadi penghitungan beban kerja dan jumlah pekerja optimal.
       
      Measuring working time is a way to determine the length of work required by workers with normal abilities. Optimizing working time in carrying out work. Standard time calculation using the stopwatch method was carried out at PT XYZ to determine standard time and workload in the slitting area, where there was no standard time for processing. Apart from that, the process of changing knives which is only carried out by one worker makes the worker feel that there is an excessive workload. With this research, standard time calculations were carried out which can be used as a reference for schedulers to determine production completion targets. This also calculates the optimal workload and number of workers.
       
      URI
      http://repository.ipb.ac.id/handle/123456789/154402
      Collections
      • UT - Industrial Management [112]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      NoThumbnail