View Item 
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Faculty of Forestry and Environment
      • UT - Forest Management
      • View Item
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Faculty of Forestry and Environment
      • UT - Forest Management
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Analisis Waktu Kerja dan Produktivitas Penyaradan Kayu Menggunakan Derek Buatan Lokal di Hutan Rakyat Pangandaran

      Thumbnail
      View/Open
      Cover (374.7Kb)
      Full teks (614.3Kb)
      Lampiran (232.7Kb)
      Date
      2020-06-12
      Author
      Sephia, S. Amelia Try
      Budiaman, Ahmad
      Metadata
      Show full item record
      Abstract
      Hutan rakyat merupakan hutan yang tumbuh pada tanah yang dibebani hak milik. Penyaradan merupakan pengangkutan kayu jarak pendek yang merupakan tahapan dalam pemanenan hutan. Kayu di hutan rakyat Pangandaran disarad dengan menggunakan mobile winch (derek buatan lokal). Penelitian ini bertujuan menghitung dan menganalisis waktu kerja dan produktivitas penyaradan kayu dengan sistem mobile winch di hutan rakyat Pangandaran. Data yang dikumpulkan meliputi waktu kerja dan produktivitas. Data waktu kerja diperoleh melalui pengukuran waktu dengan metode null stop menggunakan stopwatch handphone, sementara data produksi penyaradan diperoleh melalui pengukuran lapangan langsung. Hasil penelitian menunjukkan bahwa rata rata waktu kerja pengoperasian mobile winch sebesar 3.456 jam/siklus dan rata-rata produktivitas sebesar 1.804 m3/jam.
       
      Private forests are forests that grow on land that is burdened with property rights. Skidding is the transportation of wood over short distances which is a stage in forest harvesting. Wood in the Pangandaran private forest is skidded using a mobile winch (a locally made crane). This research aims to calculate and analyze the working time and productivity of wood skidding with a mobile winch system in the Pangandaran private forest. The data collected includes working time and productivity. Working time data was obtained through time measurements using the null stop method using a cellphone stopwatch, while skidding production data was obtained through direct field measurements. The research results show that the average working time for operating a mobile winch is 3,456 hours/cycle and the average productivity is 1,804 m3/hour.
       
      URI
      http://repository.ipb.ac.id/handle/123456789/152801
      Collections
      • UT - Forest Management [3207]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository