View Item 
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Faculty of Forestry and Environment
      • UT - Forest Management
      • View Item
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Faculty of Forestry and Environment
      • UT - Forest Management
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Biaya dan Produktivitas Teknik Penyaradan Kayu Menggunakan Derek yang Terpasang pada Hardtop Bekas di KPH Ciamis

      Thumbnail
      View/Open
      Cover (917.0Kb)
      Full teks (1.210Mb)
      Lampiran (221.6Kb)
      Date
      2024-06-12
      Author
      Qonitatun, Aulia
      Budiaman, Ahmad
      Metadata
      Show full item record
      Abstract
      Biaya operasi penyaradan merupakan faktor penting pada pemanenan hutan dengan kondisi topografi yang sulit dan curam. Derek yang terpasang pada hardtop dapat digunakan sebagai alat untuk memindahkan kayu dari tunggak ke TPn. Tujuan penelitian adalah menghitung biaya dan produktivitas penyaradan kayu dengan menggunakan derek yang dipasang pada hardtop bekas. Penentuan produktivitas melalui volume dan waktu kerja yang dihasilkan tiap siklusnya. Sementara data biaya didapatkan dari hasil wawancara dengan operator sarad untuk menentukan biaya tetap dan biaya variabel. Produktivitas rata-rata penyaradan tiap setting adalah 10,39 m3/jam dengan volume dan waktu kerja ratarata per siklus sebesar 16,84 m3 dan 1,69 jam. Adapun rata-rata jarak sarad yang ditempuh sebesar 56 m. Biaya rata-rata penyaradan sebesar Rp 9.145,21 /m3. Besarnya hasil produktivitas dan biaya penyaradan dipengaruhi oleh volume kayu yang disarad, jarak sarad, dan waktu kerja penyaradan. Di samping itu, pemilihan alat sarad yang tepat menjadi faktor penting dalam kegiatan penyaradan agar hasil yang diperoleh lebih efektif dan efisien.
       
      The cost of forest harvesting operations is essential in forested areas with difficult and steep topographic conditions. A winch attached to a hardtop can be used as an effective tool to move wood from arrears to TPn. The study aimed to calculate the cost and productivity of wood skidding using a crane mounted on a used hardtop. Determination of productivity through the volume and time of work produced each cycle. Meanwhile, costs are obtained from operator interview results to determine fixed and variable costs. The average productivity of skidding all trees is 10,39 m3 / hour with average volume and working time of 16,84 m3 and 1,69 hours. The average distance travelled is 56 m. The average cost of skidding is Rp 9.145,21/m3. The amount of productivity yield and skidding cost is influenced by the volume of wood being slipped, the distance of the skidding, and the skidding work time. In addition, selecting the right sarad tool is an essential factor in skidding activities to make the results more effective and efficient.
       
      URI
      http://repository.ipb.ac.id/handle/123456789/152800
      Collections
      • UT - Forest Management [3207]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository