Show simple item record

dc.contributor.advisorYani, Moh
dc.contributor.advisorIsmayana, Andes
dc.contributor.authorEfendi, Rizky
dc.date.accessioned2023-09-12T00:00:08Z
dc.date.available2023-09-12T00:00:08Z
dc.date.issued2023
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/124615
dc.description.abstractIndustri pulp and paper di Indonesia menghasilkan limbah berupa sludge yang berasal dari Instalasi Pengolahan Air Limbah (IPAL) dan abu sisa pembakaran boiler yang saat ini belum dimanfaatkan secara optimal. Salah satu alternatif penanganan dan pemanfaatan limbah tersebut yaitu dengan proses pengomposan. Proyek ini bertujuan untuk memanfaatkan limbah sludge dan boiler ash dari PT. Tanjungenim Lestari Pulp and Paper untuk dijadikan produk kompos dan menganalisis kualitas mutu kompos yang dihasilkan. Tujuan penelitian ini adalah merancang fasilitas bangunan rumah kompos. Hasil perancangan tata letak dilakukan dengan membuat desain 2D dan 3D dari usulan tata letak yang terpilih menggunakan bantuan software BPLAN90. Tata letak usulan yang terpilih merupakan salah satu dari 12 iterasi Algoritma BLOCPLAN. Layout yang terpilih yaitu layout usulan iterasi 7 dengan total luas area kerja 11236 m2 , total jarak penanganan bahan pada layout iterasi yang terpilih adalah sebesar 1457,72 m, dan nilai efektivitas tata letak sebesar 0,69. Desain 2D dan 3D dibuat dengan bantuan software SketchUp. Kata kunci: BLOCPLAN, IPAL, Kompos, Sludge, Tata Letakid
dc.description.abstractThe pulp and paper industry in Indonesia produces waste in the form of sludge originating from the Wastewater Treatment Plant (WWTP) and ash remaining from boiler combustion which has not been utilized optimally. One alternative handling and utilization of this waste is the composting process. This project aims to utilize sludge and boiler ash waste from PT. Tanjungenim Lestari Pulp and Paper to be used as compost products and to analyze the quality of the compost produced. The purpose of this research is to design compost housing facilities. The results of the layout design are carried out by making 2D and 3D designs from the selected layout proposals using the help of BPLAN90 software. The selected proposed layout is one of 12 iterations of the BLOCPLAN Algorithm. The selected layout is the iteration proposed layout 7 with a total working area of 11236 m2, the total material handling distance in the selected iteration layout is 1457.72 m, and the layout effectiveness value is 0.69. 2D and 3D designs are made with the help of SketchUp software. Keywords: BLOCPLAN, Composting, Layout, Sludge, WWTPid
dc.language.isoidid
dc.publisherIPB Universityid
dc.titleDesain Tata Letak Ruang dan Fasilitas Produksi Rumah Pengomposan di PT Tanjungenim Lestariid
dc.typeUndergraduate Thesisid
dc.subject.keywordBLOCPLANid
dc.subject.keywordIPALid
dc.subject.keywordKomposid
dc.subject.keywordSludgeid
dc.subject.keywordTata letakid


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record